[1]
L. Andersson K.P. Brand. The Benefits of the Coming Standard IEC 61850 for Communication in Substations. Southern African Conference on Power System Protection, Johannesburg, South Africa, 8, Nov, (2000).
Google Scholar
[2]
T. Skeie,S. Johannessen, C, Brunner. Ethernet in Substation Automation. IEEE Control Systems Magazine, June, 2002: 43-51.
Google Scholar
[3]
G.S. Kim H.H. Lee. A Study on IEC 61850 based Communication for Intelligent Electronic Devices. Science and Technology, 2005, KORUS 2005, Proceedings, the 9th Russian-Korean International Symposium on, 26 June-2 July, 2005: 765–770.
DOI: 10.1109/korus.2005.1507898
Google Scholar
[4]
A.P. Apostolov. Distributed Protection, Control and Recording in IEC 61850 based Substation Automation Systems. Developments in Power System Protection, 2004, Eighth IEE International Conference on, Volume 2, 5-8 April, 2004: 647–651.
DOI: 10.1049/cp:20040207
Google Scholar
[5]
L. Andersson,C. Brunner,F. Engler. Substation Automation based on IEC 61850 with New Process-close Technologies. 2003 IEEE Bologna PowerTech Conference, Volume 2 Bologna, Italy, June 23-26, 2003: 6.
DOI: 10.1109/ptc.2003.1304321
Google Scholar
[6]
T. Skeie,S. Johannessen,O. Holmeide. Highly Accurate Time Synchronization over Switched Ethernet. Emerging Technologies and Factory Automation, 2001 Proceedings 2001 8th IEEE International Conference on, Oct 15-18, 2001: 195–204.
DOI: 10.1109/etfa.2001.996369
Google Scholar
[7]
G. Wang K.P. Brand,T. Rudolph. Interoperability Testing and Validation of IEC 61850. Hanover Fair, (2004).
Google Scholar
[8]
C. Hoga,P. Skare. IEC 61850 Projects in Germany and Switzerland. PES TD 2005/2006, May 21-24, 2006: 390–393.
DOI: 10.1109/tdc.2006.1668524
Google Scholar
[9]
A. Apostolov, B, Muschlitz. Object Modeling of Measuring Functions in IEC 61850 based IEDs. Transmission and Distribution Conference and Exposition, 2003 IEEE PES, Volume 2, Sept 7-12, 2003: 471–476.
DOI: 10.1109/tdc.2003.1335319
Google Scholar