Centralized Control Standing Application and Development in the Automation System

Article Preview

Abstract:

The central control station is under the level of grid scheduling, in order to ensure grid safety, reliable and economic operation of modern control technology and unattended substation. Centralized control standing grid makes grid scheduling more real-time, secure, reliable, and enable enterprises to lower operating costs, to achieve downsizing to improve efficiency, improve production efficiency.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

175-179

Citation:

Online since:

October 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ackerman W J. Substation automation and the EMS[C]. In: Proc. of.Transmission and Distribution Conference, 1999 IEEE . 1999. 274-279 vol. 1.

Google Scholar

[2] K.P. Brand, Ch. Brunner, Wolfgang Wimmer. Design of IEC 61850 based Substation Automation Systems according to customer requirements, Cigre 2004, B5-103.

Google Scholar

[3] Kirkman, R. Development in Substation Automation Systems, Intelligent Systems Applications to Power Systems, 2007, Page(s): 1-6.

DOI: 10.1109/isap.2007.4441690

Google Scholar

[4] Myrda, P. Donahoe, K. The true vision,of automation, Power and Energy Magazine, IEEE, Vol. 5, Issue 3, 2007, Page(s): 32-44.

DOI: 10.1109/mpae.2007.365818

Google Scholar

[5] M. Ingram, Ehlers, R. Toward effective substation automation. Power and Energy Magazine, IEEE, Vol. 5, Issue 3, 2007, Page(s): 67-73.

DOI: 10.1109/mpae.2007.365822

Google Scholar

[6] Mohamed Rayees, A.B.S. Substation Automation Techniques and Future Trends. Innovations in Information Technology, 2007. 4th International Conference on, Page(s): 412-416.

Google Scholar

[7] Brand KP, Andersson L. The benefits of the coming standard IEC 61850 for communication in substations[C]. Southern African Power System Protection Conference, (2000).

Google Scholar

[8] Wong C Brand K P, Rudolph T. Interoperability testing and validation of IEC 61850 protective relays[C] . Anais do International Protection Testing Symposium, (2004).

Google Scholar

[9] APOSTOLOVA, VANDIVER B. Functionl testing of IEC 61850 based IEDs and Systems [C]. Proeeedings of 2004 IEEE PES Power Systems Conferenee Exposition: Vol 2, 2004, NewYork.

DOI: 10.1109/psce.2004.1397723

Google Scholar