p.2004
p.2009
p.2014
p.2019
p.2028
p.2034
p.2040
p.2045
p.2051
The Application of Fuzzy Comprehensive Evaluation in Risk Assessment of Incremental Launching Bridge
Abstract:
The risk factors of continuous incremental launching bridge during construction stage are specialized. The risk in incremental launching stage is analyzed and identified. A risk assessment index system is built. A fuzzy comprehensive evaluation model is developed. The results obtained from the risk assessment model verifies the validity and practicality of the developed method by the combination of analytic hierarchy process and fuzzy mathematics theory. Moderate risk assessment results are developed to provide references for incremental launching construction method.
Info:
Periodical:
Pages:
2028-2033
Citation:
Online since:
October 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: