The Application of Fuzzy Comprehensive Evaluation in Risk Assessment of Incremental Launching Bridge

Article Preview

Abstract:

The risk factors of continuous incremental launching bridge during construction stage are specialized. The risk in incremental launching stage is analyzed and identified. A risk assessment index system is built. A fuzzy comprehensive evaluation model is developed. The results obtained from the risk assessment model verifies the validity and practicality of the developed method by the combination of analytic hierarchy process and fuzzy mathematics theory. Moderate risk assessment results are developed to provide references for incremental launching construction method.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2028-2033

Citation:

Online since:

October 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] X. Ruan. Risk Assessment System and Key Issues for Bridge Engineering [D]. Shanghai: College of civil engineering, Tongji University, 2006(in Chinese)

Google Scholar

[2] Y. F Liu. Risk Evaluation of Bridge Construction [D]. Xi,an: Highway College, Chang,an University, China, 2005(in Chinese)

Google Scholar

[3] S. K Qin. Comprehensive Evaluation Principle and Application [M]. Beijin: Electronic Industry Press, China, 2003(in Chinese)

Google Scholar

[4] J.L Sun. A Method of Constructing a Consistency Judgment Matrix in Hierarchical Analysis [J]. Journal of Southeast University, China, 1991, 2l(3):69-70(in Chinese)

Google Scholar

[5] J Zhang. Project Risk analysis process, Method and Research Model[D]. Nanjing: Nanjing University of Science and Technology, China, 2004(in Chinese)

Google Scholar

[6] Y Qin. Research on Construction Technology in Direct Incremental Launching of Large Heavy Width Body Box Girder [D].Xian: Chang,an University, China, 2007(in Chinese)

Google Scholar

[7] Z Chen, Z.Q Wu, J.J Liu. Road Engineering Project Risk Evaluation Based on Fuzzy Analytic Hierarchy Process [J]. Changsha Communications College, China, 2008, 24(3): 44-48(in Chinese)

Google Scholar