Key Technologies of Whole Incremental Launching Construction Control for Inclined Continuous Box Girder with Steep Longitudinal Gradient

Article Preview

Abstract:

Under the background of Liuyang River Bridge, systematical studies of the key technologies of incremental launching control for inclined continuous box-beam bridge are of important theoretical significance and practical engineering value, with the features of incremental launching construction control difficulties caused by vertical curve, skew, steep longitudinal gradient, and with cantilever flange and heavy box girder. The results show that the limitation of dead weight of box girder can be overcome by precast supporting system composed of box-girder precast bearing system and box-girder incremental launching bearing system. The factors of stiffness and weight of main girder should be considered for guiding beam configuration in incremental launching construction, which should choose reasonable stiffness, length and weight, to assure that the negative moment peak of largest cantilever status and a status when guiding beam is on the pier is consistent with the largest fulcrum negative moment during the use state. The predictive value and measured value of stress and deformation of whole process of steep longitudinal gradient incremental launching about inclined continuous box beam are in good agreement. Horizontal traction force of jack, transverse offset of box beam and stress of temporary pier are all be well controlled, satisfying all design requirements, which means that simulation analysis and control of whole process of incremental launching is effective and feasible. The study results offer reference for similar bridges about the whole process of incremental launching construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2034-2039

Citation:

Online since:

October 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xing Shangguan. A new idea about incremental launching technology of comtinuous bridge [J]. Northeast Highway, 1994, 4: 71~82 (in Chinese)

Google Scholar

[2] R Macro. Prestressing schemes for incrementally launched bridges [J]. Journal of Bridge Engineering, 1999, 5: 107~115

DOI: 10.1061/(asce)1084-0702(1999)4:2(107)

Google Scholar

[3] Liang Ren, Zhi Fang, Xing Shangguan. The technology of incremental launching construction of PC beam bridge. High Way, 2010,3:71-73 (in Chinese)

Google Scholar

[4] Changyu Shao. Technical Consideration and Features of Composite Structure Bridges of Jiubao Bridge in Hangzhou[ J]. Bridge Construction, 2009 ( 6): 42- 45 (in Chinese)

Google Scholar

[5] Weifeng Wang, Junfeng Lin, Wentian Ma. Optimum analysis of launching nose during incremental launching construction of bridge[J]. Engineering mechanics, 2007, 24(2): 132-138 (in Chinese)

Google Scholar