Mianyang Xishan Pteris Pool Leak and Landscape Reconstructing Project Analysis

Article Preview

Abstract:

Due to tight deadlines and shortage of funds, Mianyang Western Hills Park of Pteris pool building fails to design perfect construction. During use,pond leakage is obvious and the landscape effect is very poor. Comparing the transformation to resolve existing problems through program optimization.In order to achieve high quality, ecological and environmentally friendly, good landscape, low-cost are integrated into one.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

318-320

Citation:

Online since:

October 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Huang Chengcai ,Yang fang. The discussion of Wetland park planning and design[J]. Central South Forestry Survey and planning, 2004,23(3):26—29(In Chinese).

Google Scholar

[2] Wang lin, Luo Shujin, City wetland landscape ecological design[J]..The garden magazine of China, 2004.8(In Chinese).

Google Scholar

[3] The Ministry of housing and Urban-Rural Development. City Wetland Park Planning and design guidelines. 2011.1(In Chinese).

Google Scholar