Study on Flood Discharge and Countermeasures of ShiQiao Reservoir Spillway

Article Preview

Abstract:

The ShiQiao Reservoir was built in the 1950s, whose main functions are irrigation and flood control. With the increasing number of downstream agricultural water, the contradiction is increasingly prominent between pettier beneficial capacity and the raising downstream agricultural water; at the same time, due to the disrepair of spillway and the increase of upstream inflow, the original spillway flood discharge capacity cannot meet the requirements for flood control. On the basis of systematical investigations of engineering geology and hydrogeological, an effective method is proposed for plain reservoirs to solve these problems. The method is, by improving the weir crest elevation and widening spillway to address the inadequate of beneficial capacity and the low standard of flood control spillway. Through the validation of analysis and calculation, this method is feasible and economical. It fundamentally solves the problems of ShiQiao Reservoir, and ensures the safe operation of this reservoir.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

699-704

Citation:

Online since:

October 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Huali Dong, Jiyong Xia. Safety evaluation of small scale reservoir. J.Zhejiang Wat. Cons & Hydr. College. 2009. (3):56-58. (in Chinese)

Google Scholar

[2] Laifa Chen, Dashui Gao, Hongsheng Zuo. Danger removal and reinforcement design for Lucun reservoir. Yangtze River.2011.(12):97-100. (in Chinese)

Google Scholar

[3] Nan Peng, Liping Peng. Problems Existing in the Strengthening and Eliminating Dangers Design of the Spillway and Its Solution. Journal of Pingxiang College.2008. (12):29-31. (in Chinese)

Google Scholar

[4] YANG J, CEDERSTRÖM C. Modification of spillways for higher discharge capacity. Journal of Hydraulic Research.2007. (5): 701-709.

DOI: 10.1080/00221686.2007.9521807

Google Scholar

[5] Min Wang, Hongsheng Wang, Hao Tan, Chunjiang Ye. Medium-sized dangerous reservoirs of the Yellow River Basin Problems and reinforcement. Yellow River.2002.(10). (in Chinese)

Google Scholar

[6] James Yang, Karin Hellstadius, Malte Cederström. Case study of spillway modifications—a means to a higher level of dam safety. Chinese Journal of Geotechnical Engineering. 2008. (12):1707-1712

Google Scholar

[7] Chigong Wu. Hydraulics. Beijing: Higher Education Press, (2008)

Google Scholar

[8] Ministry of Water Resources, Tianjin Water Conservancy and Hydropower Survey and Design Institute. The design code for spillway (SL253 – 2000). Beijing: China Water Power Press, 2000.

Google Scholar

[9] Jinliang Yang. Soil Mechanics. Beijing: China Water Power Press, (2009)

Google Scholar