The Capability Analysis of Flood Discharge in Ningmeng of Yellow River

Article Preview

Abstract:

the amount of water and sediment reduce obviously in Ning Meng reach because of the influence of the regulation of Long-Liu reservoir in upper of Yellow River、rainfall and production and living use water, especially the time reduce of large flows and the growth of small flow duration time, resulting main channel siltation and atrophy severe in the Inner Mongolia Reach, lower bankfull discharge, the main channel flooding capacity decreased when the great flood of water level rise, resulting in the increase of the river's ice flood control pressure. The study will provide technical support for flood control decision-making.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

705-709

Citation:

Online since:

October 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] C.H. Hu: Journal of Hydraulic Engineering, 2006, 37 (11): 1283 -1289. In Chinese

Google Scholar

[2] W.Y. Yao, W.X. Li, S.Z. Hou: Journal of Hydraulic Engineering, 2005,36 (3): 0257 - 0 264. In Chinese

Google Scholar

[3] X.X. Xue: Yellow River, 2003, (2): 8 - 9. In Chinese

Google Scholar

[4] Y.C. Wang, X.W. Ping:Yellow River, 1996, (1): 5 - 10. In Chinese

Google Scholar

[5] S.Z. Hou, P. Wang: Yellow River, 2007, (4): 21 - 22. In Chinese

Google Scholar

[6] Lanzhou Institute of Desert: Yellow River, 1988, (1):14 - 19. In Chinese

Google Scholar

[7] S.Z. Hou: Yellow River, 2007, (1): 25 - 26. In Chinese

Google Scholar