Analysis of Inflow Design Flood for Liujiaxia Reservoir under Dynamic Operation of Flood Limited Water Level for Ten-Day Period

Article Preview

Abstract:

the layout and the characteristics of the cascade reservoirs and hydropower stations in the upper reaches of the Yellow River, determine that cascade hydropower stations scheduling must be operated based on the joint operation between Longyangxia and Liujiaxia cascade hydropower stations, especially on flood control operation. This paper deeply analyzes design flood storage area of the Liujiaxia composition and Longyangxia-Liujiaxia joint flood regulating principle on the basis of analyzing and calculating each ten-day design flood of the Tangnaihai above main stream and the intervals. Therefore, the reasonable combination of interval flood and the process of Longyangxia reservoir flood discharge is confirmed, and thereby, studying Liujiaxia reservoir inflowing design flood under a controlling operation of flood limited water level for a period of ten-day to ensure the safety of Liujiaxia reservoir flood control.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

725-730

Citation:

Online since:

October 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Z. F. Han, Journal of Northwest Hydroelectric Power, Vol. 22 (2006), P.32-35

Google Scholar

[2] J.Q. Li; Z. Z. Yao; H.S. Jia; et al.. Journal of Hydroelectric Engineering, Vol. 26(2007)P.1-6

Google Scholar

[3] X. Li, S. L. Guo , P. Liu, et al.. Journal of Hydrology, Vol. 391 (2010), P.124-126

Google Scholar

[4] W. S. Luo ; X. Y. Song. Engineering Hydrology and Water Conservation Calculation. China Water Power Press. (2010)

Google Scholar

[5] W.H. Yang, M.Z. Sun, Journal of Hydroelectric Engineering, Vol. 1(2000)P.12-21

Google Scholar

[6] H.S. Jia, YELLOW RIVER, Vol. 19 (1997), P1-4

Google Scholar