Study on Earthwork Allocation Balance of Nuozhadu's Core Rockfill Dam

Article Preview

Abstract:

According to the analysis of Nuozhadu's core rockfill dam over its relationship of material balance and progress coordination between filling and excavation engineering, by means of linear programming method, combining with the actual construction, mathematical model of earthwork allocation optimization is established. Through using the actual application, it achieves the goal of saving resources and cost, reasonable and fast construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

826-830

Citation:

Online since:

October 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Sun Xiheng, Qi Donghai. Computer Simulation and Program Design of Water Conservancy and Hydropower Engineering Construction[M]. Beijing: China WaterPower Press, 1997(In Chinese).

Google Scholar

[2] Shen Mingliang, Ni Jingchu. Research and Software Development on Materials balanced method. Yangtze River, 2001, 32(4): 25-26(In Chinese).

Google Scholar

[3] Cao Shengrong, Wang Xianjia, Shen Mingliang. Systems Analysis and Constitution of Linear Programming Model for the Earth-rock Allocation System of Massive Water Resources and Hydropower Projects[J]. Engineering Science, 2003,(7): 72-76(In Chinese).

Google Scholar

[4] Shen Mingliang, Liu Shaolin, Chen Wei. Construction Simulation and Earthwork Balance of Water Conservancy and Hydropower Engineering[M]. Beijing: China WaterPower Press, 2007(In Chinese).

Google Scholar