Stability Evaluation for Cut-Off Wall of Daning Reservoir during Operation Period

Article Preview

Abstract:

The stress and deformation of cut-off wall will be changed as the water level cyclical varying during reservoir's operation. Therefore, the prediction is important to the safety and stability of reservoir. In this paper, the seepage characteristics of the highest and the lowest water level condition have been predicted, and the variation of horizontal displacement is discussed under the vehicle load of road and cyclical fluid load. Meanwhile, the displacement distribution and stress state in junction area of the upper wall and the lower wall are obtained. The results show that the Cut-off wall is less affected by the vehicle load of road, and its stress and deformation will gradually stabilize after the second water store-discharge cycle. The upper reinforced concrete wall will tilt towards outside of reservoir, but the deformation is very small at lower plastic concrete wall. The guide wall has a good effect on preventing the upper wall's inclining and improving the lower wall's stress environment. Besides, the maximum principle stress of cut-off wall is too small to course plastic failure.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

835-840

Citation:

Online since:

October 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Qingyou Wang, Wangong Sun, Huan Xiong. Plastic Concrete Cutoff Wall [M]. China WaterPower Press, 2008. (in Chinese).

Google Scholar

[2] Changxi Mao. Seepage Computation Analysis & Control [M]. Beijing: China WaterPower Press, 2003. (in Chinese).

Google Scholar

[3] Yong Yan. Research on Seepage Stress Coupling of Metro Deep Foundation Pit [J]. Journal of Railway Engineering Society, 2011, (6): 93-96. (in Chinese).

Google Scholar

[4] Shucai Li, Shuchen Li, Weishen Zhu, et. al. Hydro-Mechanical Coupling Analysis on Stability of Cofferdam of Tai'An Pumped-Storage Station [J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(8): 1276-1277. (in Chinese).

Google Scholar

[5] Fei Zhang, Jingpei Li. Calculation of Water Pressure and Earth Pressure in Foundation Pit by Considering Fluid-Solid Coupling [J]. Geotechnical Investigation & Surveying, 2011, (2): 1-2. (in Chinese).

Google Scholar

[6] Shuyun Ding, Zhengyin Cai. Summary of Seepage Research for Embankment Dam [J]. Yangtze River, 2008, 39(2): 33-35. (in Chinese).

Google Scholar

[7] Weihong Huang, Deyun Wang, Qiwei Zhang, et. al. Analysis on Impacts from Olympic Events on Long Term Stability of Ming Tombs Reservoir Dam [J]. Water Resources and Hydropower Engineering, 2009, 40(12): 114-117. (in Chinese).

Google Scholar

[8] Yongxing Jiang, Zhonglie Qu. Influence Analysis of the Storage Process on the Stress and Strain of Cutoff Wall [J]. Journal of Zhejiang Water Conservancy and Hydropower College, 2011, 23(1): 13-14. (in Chinese).

Google Scholar

[9] Huili Guo, Weicai Yang. Three Dimensional Finite Element Analysis for Stress Deformation of Cutoff Wall in Plain Reservoir [J]. Journal of Water Resources and Architectural Engineering, 2007, 5(2): 50-52. (in Chinese).

Google Scholar

[10] Xiaoqiang He, Faning Dang, Shangjie Xu, et al. Three Dimensional Finite Element Analysis on Stress and Deformation of Cofferdam and Cut-off Walls of Shenxigou Hydropower Station [J]. Journal of Water Resources and Architectural Engineering, 2009, 7(2): 100-101. (in Chinese).

Google Scholar

[11] Zheng Si, Yaolong Chen, Shouyi Li. Stress-deformation Analysis of Plastic Concrete Diaphragm Wall in Dam Foundation Earth-Rockfill Dam [J]. Water Power, 2008, 34(2): 32-35. (in Chinese).

Google Scholar

[12] Junjie Wang, Hejun Chai. Active Earth Pressure Induced by Saturated Subgrade under Vehicle Load [J]. Chinese Journal of Geotechnical Engineering, 2008, 30(3): 373-376. (in Chinese).

Google Scholar

[13] Honghu Yuan, Ruman Zhang. Beijing-Shijiazhuang Expressway Reconstruction Project (the Fifth Ring Road~Zhao Xindian Overpass) to Beijing South to North Water Diversion Supporting Project Daning Regulating Reservoir West Embankment Cutoff Wall Engineering Safety Assessment Report [R]. Bejing Institute of Water. (2010).

Google Scholar

[14] Ronglu Wang, Tiesheng Dou, Huan Xiong, et al. Finite Element Analysis on Stress Deformation of Cutoff Wall in Auxiliary Dam for Daning Reservoir In Beijing [J]. Water Resources and Hydropower Engineering, 2010, 41(3): 46-47. (in Chinese).

Google Scholar

[15] JTGD60–2004 General Code for Design of Highway Bridges and Culverts[S]. The Ministry of Communications of P R C, 2004. (in Chinese).

Google Scholar