p.660
p.664
p.669
p.674
p.681
p.685
p.692
p.698
p.704
Pre-Reinforcement Technology in Broken Roof Side Condition
Abstract:
The roof side broken brings serious security risks in the construction in coal mine. The geological structure of faults and folds that encountered in coal mine and the affect of abutment pressure in the goaf creat roof side broken. If in the way of reinforced support to control the surrounding rock, it is difficult to achieve the expected security. Especially if the roof side broken appears in the mining gateway, controlling the surrounding rock by the way of reinforced support causes waste of materials and the supporting effect is limited. So, combined with the distribution of abutment pressure of the surrounding rock in broken roadway, starting from the nature change of the surrounding rock, through injection of Malisan to change the broken condition of surrounding rock, the broken roadway is effectively.under control.
Info:
Periodical:
Pages:
681-684
Citation:
Online since:
November 2012
Authors:
Keywords:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: