The Evaluation Method of Critical Equipments in a PdM System

Article Preview

Abstract:

The method of how to select target equipments in a whole plant for a PdM program is proposed in the paper. A set of evaluation standards using criticality analyzing approach are established. This method is applied in many plants and is verified with the actual condition of plant requirement. The evaluation results fit for the criticality of all plants and will be different in different plants because of service and functional role played even for the same type machine.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

332-335

Citation:

Online since:

December 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Jack R. Nicholas, R. Keith Young. Predictive Maintenance Management, 3rd Edition. Reliabilityweb. com publication, (2008).

Google Scholar

[2] Dean A. Lofall, DLI engineering corp., Integrating CMMS with Predictive Maintenance Software, www. DLIengineering. com.

Google Scholar

[3] PdM program setup, www. fluke. com/pdm.

Google Scholar

[4] Yang Guang. Research on intelligent diagnosis and predictive maintenance system of mechanical equipment failures. Friend of Science Amateures. Vol. 10, 2011: 41-42.

Google Scholar

[5] Dheeraj Bansal, David J. Evans and Barrie Jones. A real-time predictive maintenance system for machine system[J]. International Journal of Machine Tools & Mamufacture 2004(44): 759-766.

DOI: 10.1016/j.ijmachtools.2004.02.004

Google Scholar