Monitoring and Analysis of Blasting Vibration of Diversion Tunnel Excavation in Layered Rock Mass

Article Preview

Abstract:

In order to insure the safety and stability of the existed dam body and dam curtain during the diversion tunnel excavation, the vibration velocities were analyzed based on in-site blasting vibration monitoring. Result shows that the elevation difference between explosion point and monitoring points has a great impact on the vibration velocity in addition to single fire dynamite and blast center distance. During data analysis, the traditional empirical formula of attenuation of blasting earthquake must be amended. Through contrasting and analyzing, the amended formula of attenuation of blasting earthquake wave is precise relatively. At the same time, two collapses during the diversion tunnel excavation were analyzed based on the characteristics of layered rock mass and fault distribution, and the explosion parameters were optimized, so that the damage effect of blasting vibration was controlled effectively. This research also takes a good effect in other similar works.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1047-1052

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xuemin Zhang, Jun-sheng Yang, Baochen Liu, Study on blasting seismic dynamic effect for tunnels with close interval in bedded rock mass[J], Journal of Hunan University of Science & Technology (Natural Science Edition), 200, 21(4): 70-74.

Google Scholar

[2] Fengcheng Liu , Wuxing Hu , Xuechen Cui, Analysis on test results of blasting vibration of anchored crane beam in xilongchi power station [J], Journal of Yangtze Rive Scientific Research Institude, 2008, 25(5): 171-174.

Google Scholar

[3] Yunpeng Li, Chuanzhi Ai , Changling Han , Ming Huo, Study on dynamics effect caused by blasting construction by numerical simulation for tunnels with small spacing [J], Explosion and Shock Waves, 2007. 27(1): 75-81.

Google Scholar

[4] Tan Zhong-sheng, Yang Xiao-lin, Wang Meng-shu, Effect of blast in double line tunnel on existing tunnel [J], Chinese Journal of Rock Mechanics and Engineering, 2003, 22(2): 281-285.

Google Scholar

[5] Hongbing Xia, Haibo Wang, Qi Zong, Comprehensive analysis of controlling technology of blasting vibration effect [J], Engineering Blasting, 2007, 13(2): 83-86.

Google Scholar

[6] GB 6722-2003, Blasting Safety Regulations[S]. 2004: 40-43.

Google Scholar

[7] Baozhen Li, Dian Wang, Discussion on the relationship between highness difference and blasting vibration and attenuation orderliness [A], The Paper Volume of 6th National Engineering Blasting Academic Conference[C], 1997. 778-783.

Google Scholar

[8] Shouru Chen, The compare and choice of two formula of particle vibration forecasting [A], 7th National Engineering Blasting Academic Conference[C], 2001. 702-706.

Google Scholar

[9] Mingbiao Xu, Dehong Peng, Analysis on the vibration measurement in high slope excavation of Xiao wan Hydropower Station [J], Yangtze River, 2007, 38(2): 135-138.

Google Scholar