Loess Highway Tunnel Construction Process of Three Dimensional Numerical Simulation

Article Preview

Abstract:

In recent years, as China's national sustained and rapid economic development, the state increased investment to middle-western region, promote the regional development of high grade highway. Therefore, highway tunnel through loess area is getting more and more. Due to the special physical properties of loess, it makes the loess tunnel construction a hot topic. To study on the deformation law of the loess highway tunnel, this paper based on the Shanxi Province Guang Ling to Hun Yuan highway tunnel—East Fu Yao tunnel, we simulate the whole section pre-reinforcement construction technique for three dimensional numerical, and combined with field monitoring measurement to compare and analyze in paper

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1276-1279

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Eisenstein Urban Tunneling Challenges & Progresses.(2000)

Google Scholar

[2] Ralph Peck & Alan Powderham. Rethinking construction. Groung Engineering. March.(1999)

Google Scholar

[3] The Observational Method in ground engineering: principles and applications. Constructional Industry Research and Information Association.Report185

Google Scholar

[4] K.ONO, M.YAMADA. Analysis of the arching action in granular mass. Geotechnique. Vol.43.No.1.(1993)

Google Scholar

[5] D.LESNIEWSKA. Limit equi1ibrium approach to study the evo1ution of shear band systems in soils. Geotechnique.Vol.50.No.5.(2000)

Google Scholar

[6] S.THOMSON. Field measurements in two tunnels in Edmonton, Alberta. Can. Geoteeh. J.Vol.17.(1980)

Google Scholar

[7] R.K Rowe, K.Y.LO. Amethod of estimating surface settlement above tunnels constructed in soft ground. Can. Geotech. J.Vol.20.(1983)

DOI: 10.1139/t83-002

Google Scholar