Numerical Analysis of Drilling Process of Bored Pile in Seasonal Frozen Ground in the West of China

Article Preview

Abstract:

In order to research shrinkage of hole-wall and plastic region around hole-wall of bored pile in drilling process, a porous analysis model was built, and drilling process of bored pile, under dry excavation technology and hydraulic excavation technology, were simulated by element birth and death feature in ADINA software. Numerical analysis results show that to seasonal frozen ground in the west of China, dry excavation technology is not appropriate, consolidation settlement caused by drilling is small and can be taken into no consideration in design, major problem in hydraulic excavation technology is shrinkage of hole-wall, which mainly influenced by density of slurry and excavation depth one time.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

503-506

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] ZHANG Zhongting, DING Xiaoxue. Design and Construction of Bored Pile[M]. Beijing: China Architecture &Building Press, 2007. (in Chinese).

Google Scholar

[2] Shi Dequan, Liu Gang. Research and treatment of borehole walls' collapse and landslide accidents[J]. West-China Exploration Engineering, 2004, 16(7): 124-125. (in Chinese).

Google Scholar

[3] LI Xiaoqing, Wu Xiaoming. Analysis of stability of hole-wall of bored pile[J]. Geology and Prospecting, 2001, 37(2): 74-76. (in Chinese).

Google Scholar

[4] WANG Zhongwen. Research of Factors Affecting Stabilization of Hole Wall of Bored Pile[J], Journal of Highway and Transportation Research and Development, 2011, 28(1): 86-90, (in Chinese).

DOI: 10.1061/jhtrcq.0000110

Google Scholar

[5] LIU Zhikui, LIANG Jincheng, HUANG Yingdi. Stability of hole-wall in artificial drill hole piles[J]. Mineral Resources and Geology, 2003, 17(5): 648–650. (in Chinese).

Google Scholar

[6] WANG Yungang, ZHANG Guang, HU Qi. Analysis of stability of Bored Pile Hole-Wall [J] Chinese Journal of Rock Mechanics and Engineering. 2011, 30(1): 3281-3287. (in Chinese).

Google Scholar