Study on Leakage Induced Settlement of the Adjacent Structures

Article Preview

Abstract:

Field monitoring datum of a foundation pit are reviewed and analyzed to explain the settlement of adjacent structures. Settlements of adjacent structures induced by the water level fall are calculated through the principle of effective stress in saturated soil and the stratified summation method. The calculated settlement 31.93mm is close to the observed value 28.8mm. This confirms the effective stress increased by the leakage is the main cause of the settlement of adjacent structure.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

570-575

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Huang Qiang. Deep foundation pit engineering design [M]. China Building Materials Industry Press, Beijing(1995).

Google Scholar

[2] Gong Xiaonan editor. Deep foundation pit engineering design manual [M]. China Building Industry Press, Beijing(1988).

Google Scholar

[3] He Songling. The discussion about stratified summation method of foundation deformation calculation accuracy [J]. Engineering survey.1997.6:10~13.

Google Scholar

[4] Zhou Jian etc. Underground water level and Environmental geotechnical engineering [M]. Shang Hai, Tongji University Press.1995.

Google Scholar

[5] Code for design of building foundation(GB50007-2002). Ministry of Construction people's republic of China. China Building Industry Press, Beijing(2002.1).

Google Scholar

[6] Technical Specification for Retaining and Protection of Building Foundation Excavations(JGJ120-99). Ministry of Construction people's republic of China. China Building Industry Press, Beijing(1999).

Google Scholar