[1]
gen-bao zhang,modern quality project. China Machine Press. (2000).
Google Scholar
[2]
International Standard Organization. The ISO Survey of ISO 9000 and ISO 14000 Certifications Tenth cycle. 2001: 1-19.
Google Scholar
[3]
A. Kaufmann. Introduction to the Theory of Fuzzy Subsets. New York. 1975. 1.
Google Scholar
[4]
Wang Qiu-sheng. The Evaluation of Construction Engineering Design Based on the Fuzzy Evaluate Method. Shanxi Agric Univ. 2001No6: 71-79.
Google Scholar
[5]
WUXiao-ping. A research on multiple-objective decision-making method and model for evaluating railway schemes based on Grey and Fuzzy Sets Theory.
Google Scholar
[6]
Saaty T L. The analytic hierarchy process. New York: Mcgram-Hill. (1980).
Google Scholar
[7]
Saaty T.L. Modeling unstructured decision problems: theory of analytical hierarchies. Mathematics and Computers in Simulation. Vol. 20. 3: 147-157.
DOI: 10.1016/0378-4754(78)90064-2
Google Scholar
[8]
Saaty T.L. Mathematical modeling of dynamic decisions, Priorities and hierarchies with time dependence. Mathematics and computers in simulation. Vol. 21: 352-358.
DOI: 10.1016/0378-4754(79)90004-1
Google Scholar
[9]
Subhankar Karmakar, P.P. Mujumdar, Grey fuzzy optimization model for water quality management of a river system, Advances in Water Resources, Volume 29, Issue 7, July 2006, Pages 1088-1105.
DOI: 10.1016/j.advwatres.2006.04.003
Google Scholar
[11]
Chihui Zhu, Nianping Li, Di Re, Jun Guan, Uncertainty in indoor air quality and grey system method, Building and Environment, Volume 42, Issue 4, April 2007, Pages 1711-1717.
DOI: 10.1016/j.buildenv.2006.01.015
Google Scholar
[12]
Che-Tsung Tung, Yu-Je Lee , A novel approach to construct grey principal component analysis evaluation model, Expert Systems with Applications, Volume 36, Issue 3, Part 2, April 2009, Pages 5916-5920.
DOI: 10.1016/j.eswa.2008.07.007
Google Scholar