Spillway Design for Zuocun Reservoir Danger Control and Reinforcement Project

Article Preview

Abstract:

As a specific example,this paper introduces the whole arrangement of the spillway of Zuocun reservoir,and explains a specific course of spillway design for small-scale reservoir danger control and reinforcement project from three aspects, the calculation of discharge capacity、water surface profile of chute and hydraulic calculation of stilling pool. The project can provide a reference for similar engineering.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1378-1382

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] The Ministry of Water Resources and Hydropower Design and Research Institute of Tianjin. SL 253—2000 Design code for the spillway[S]. Binjing: China WaterPower Press . (2000).

Google Scholar

[2] North China Water Resources and Hydropower Design Limited Company of Henan. The preliminary design for danger control and reinforcement project of Zuocun reservoir in Linfen City[R]. Zhengzhou: North China Water Resources And Hydropower Design Limited Company Of Henan, (2011).

DOI: 10.17660/ejhs.2020/85.5.8

Google Scholar

[3] Li Yang. Spillway design for Donggou reservoir danger control and reinforcement project[J]. China Science and Technology Information, 2012(8): 88.

Google Scholar

[4] Zhou Xiaochen. Discussion on the Hydraulic Calculation of the Spillway of Yangwanze Reservoir[J]. Sci-Tech Information Development & Economy, 2008, 18(22):218~219.

Google Scholar

[5] Shen Changsong. Hydraulic Structure[M]. Bejing: China WaterPower Press . (2008).

Google Scholar