Fuzzy AHP Applying in the Material Management of Construction Project

Article Preview

Abstract:

Strengthing the material management and controlling materials consumption as one of the most important means to control engineering cost, play a decisive impact on the profit and loss of construction enterprises. Factors affect materials management are complex, so that combined with conventional methods can not effectively improve the efficiency of material management. Introducing the Fuzzy Analytic Hierarchy Process (AHP) in construction project material management for this issue to calculate and analysis the specific gravity of the content that in construction project material management,and find out the main management contents, so as to improve the efficiency of material management.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2714-2717

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] MingzhongYe. Discussion about the cost of the project management [J]. Theoretical study of urban construction. 2012(5).

Google Scholar

[2] Zhongmin LI. Output value of China's construction industry profit margin of only 3. 6% in 2011 [N]. China Construction News,2012/05/15.

Google Scholar

[3] Ji-yong Shen. The Construction Production Rate Influence Factor Analysis Method Based on the Analytic Hierarchy Process (AHP) [J]. Construction Technology,Volume 34, February (2005).

Google Scholar