Multiprocessor Flow Shop Scheduling Problem with Common due Window

Article Preview

Abstract:

The objective of scheduling is to maximize capacity utilization, minimize work-in-process inventory and ensure timely delivery. The due windows problem proposes that jobs should only be finished within the time interval that meets customer needs. This research applies integer programming (IP) and ant colony optimization (ACO) to solve due window problems in a flow shop with multiprocessors (FSMP). To improve the performance of jobs within due windows, this research splits them into different numbers of processing lots so they can be processed on more than one machine simultaneously. This shortens the total weighted earliness and tardiness of the jobs. The ACO is applied as a heuristic tool for solving the scheduling problems, and the solution results show that ACO has good validity, robustness and effectiveness.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

3712-3716

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] E.G. Negenman, Local search algorithms for the multiprocessor flow shop scheduling problem, Eur. J. Oper. Res. 128 (2001) 147-158.

DOI: 10.1016/s0377-2217(99)00354-9

Google Scholar

[2] C. Oğuz, Y. Zinder, Van Ha Do, A. Janiak, M. Lichtenstein, Hybrid flow shop scheduling problems with multiprocessor task systems, Eur. J. Oper. Res. 152 (2004) 115-131.

DOI: 10.1016/s0377-2217(02)00644-6

Google Scholar

[3] F. Sivrikaya-Serifoglu, G. Ulusoy, Multiprocessor task scheduling in multistage hybrid flow shops: A genetic algorithm approach, J. Oper. Res. Soc. 55 (2004) 504-512.

DOI: 10.1057/palgrave.jors.2601716

Google Scholar

[4] C. Low, Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines, Comput. Oper. Res. 32 (2005) 2013-(2025).

DOI: 10.1016/j.cor.2004.01.003

Google Scholar

[5] K.C. Ying, S.H. Lin, Multiprocessor task scheduling in multistage hybrid flow shops: An ant colony system approach, Int. J. Prod. Res. 44 (2006) 3161-3177.

DOI: 10.1080/00207540500536939

Google Scholar

[6] Z.L. Chen, C.Y. Lee, Parallel machine scheduling with a common due window, Eur. J. Oper. Res. 136 (2002) 512-527.

Google Scholar

[7] R.H. Huang, C.L. Yang, Ant Colony System for Job Shop Scheduling with Time Windows, Int. J. Adv. Manuf. Techno. 39 (2008) 151-157.

DOI: 10.1007/s00170-007-1203-9

Google Scholar

[8] B. Yao, C. Yang, J. Hu, J. Yao, J. Sun, An Improved Ant Colony Optimization for Flexible Job Shop Scheduling Problems. Adv. Sci. Lett. 4 (2011) 2127–2131.

DOI: 10.1166/asl.2011.1601

Google Scholar

[9] W.X. Zheng, H. Nagasawa, N. Nishiyama, Single-machine scheduling for minimizing total cost with identical, asymmetrical earliness and tardiness penalties, Int. J. Prod. Res. 31 (1993) 1611-1620.

DOI: 10.1080/00207549308956812

Google Scholar