[1]
Yamagami T., Ueta Y. Search for noncircular slip surfaces by the Morgenstern-Price method [J]. Proc., 6th Int. Conf. Numer. Methods in Geomech., 1988, (6):1219-1223.
Google Scholar
[2]
Chen Yumin, Liu Hanlong, Chen Ze. Working mechanism and numerical simulation of assembly coastal building techniques [J]. Journal of Central South University of Technology, 2008, 15 (S2) :180-185(in Chinese) .
DOI: 10.1007/s11771-008-0455-3
Google Scholar
[3]
Zhang Lihong. Pre-processing and post-processing method for geostress simulation using seismic interpretation results [J]. Mining Science and Technology, 2009, 19 (3) :369-372(in Chinese) .
DOI: 10.1016/s1674-5264(09)60069-7
Google Scholar
[4]
Gao Mingshi, Dou Linming, Zhang Nong, etal. Simulation of the relationship between roadway dynamic destruction and hypocenter parameters [J]. Journal of China University of Mining & Technology, 2008, 18 (1) :93-97(in Chinese) .
DOI: 10.1016/s1006-1266(08)60020-6
Google Scholar
[5]
Clough A. K. Variable factor of safety in slopes stability analysis by limit equilibrium method [J]. 1st Eng., 1988, 69(3):149-155.
Google Scholar
[6]
Chen Z. Y. , Shao C.M. Evaluation of minimum factor of safety in slope stability analysis [J]. Can. Geotech., 1988, 25(4):735-748.
DOI: 10.1139/t88-084
Google Scholar
[7]
Meiketsu Enoki, Mori., Yagi., Ryuichi et al. Generalized slice method for slope stability analysis [J]. Soil. Found, 1988 , 30(2):1-13.
Google Scholar
[8]
PAN Yue, ZHANG Yong, WU Mingying, et, al. Analyswas of catestrophe theory for pillar destabilization in dwassymmetric mining [J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 25(S2):3694–3702 (in Chinese) .
Google Scholar
[9]
LI Jiangteng, CAO Ping . Analyswas of pillar stability in hard rock mass by longitudinal splitting based on catastrophe theory [J]. Journal of Central South University, 2006, 37(2):371–375 (in Chinese) .
Google Scholar
[10]
CUI Shaodong, LIU Baoguo . Stope structure parameters' optimization of north Shirengou iron mine [J]. Journal of Beijing JiaoTong University, 2009, 33(1):131–134 (in Chinese) .
Google Scholar
[11]
LIU Peihui. Optimization of numerical simulation for stope structure parameters of thick ore body based on stress boundary method [M.Theswas][D]. Changsha:Central South University, 2002 (in Chinese) .
Google Scholar
[12]
LU Ping . Optimization of Deep Stope Structure Parameters and Mining Sequence [M.Theswas][D]. Chongqing:Chongqing University, 2008(in Chinese) .
Google Scholar