Research on Dynamic Scheduling Technology in Job Shop with Tool Flow

Article Preview

Abstract:

To solve the tool flow and part flow interaction problems in job-shop scheduling, a kind of dynamic scheduling technology in job shop with tool flow is proposed. A new method of decision point calculation and a new heuristic approach for job selection named tools-minimally-occupied (TMO) are proposed. According to the method and the rule, the problems of when and how to select the parts in the dynamic scheduling are solved. The technology is proved to be effective by examples.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

685-688

Citation:

Online since:

March 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Nebil Buyurgan, Can Saugin, S. Engin Kilic:Tool allocation in flexible manufacturing systems with tool alternatives. Robotics and Computer-Integrated Manufacturing, vol.20(2004), pp.341-349.

DOI: 10.1016/j.rcim.2004.01.001

Google Scholar

[2] LIU Aijun, YANG Yu, XING Qingsong:Dynamic scheduling on multi-objective flexible Job Shop.Computer Integrated Manufacturing Systems, vol.17(2011), pp.2629-2637.

Google Scholar

[3] V. Vinod, R. Sridharan:Dynamic job-shop scheduling with sequence-dependent setup times: Simulation modeling and analysis. International Journal of Advanced Manufacturing Technology, vol. 36(2008) , pp.355-372.

DOI: 10.1007/s00170-006-0836-4

Google Scholar

[4] Wu Xiuli:Research on flexible Job Shop dynamic scheduling problem. Journal of System Simulation, vol. 20(2008), pp.3828-3832.

Google Scholar

[5] DENG Jianchun, TONG Guofan, ZHAO Tianqi:Research on algorithm of dynamic scheduling in FMS. Modular Machine Tool & Automatic Manufacturing Technique, (1998), pp.14-17.

Google Scholar