[1]
Box Q E P, Jenkins G M. Time Series Analysis: Forecasting andControl. San Francisco: Holden-day Press, 1970.
Google Scholar
[2]
Hannan E J. The estimation of the order of an ARMA process. Annals of Statistics, 1980, 8(5): 1071-1081.
Google Scholar
[3]
Boker J, Keviczky L. Structural properties and structure estimation of vector difference equations. International Journal of Control, 1982,36(3): 461-476.
DOI: 10.1080/00207178208932908
Google Scholar
[4]
Deng Z L, Guo Y X. Dynamic System Analysis and Its Application.Shenyang: Liaoning Science & Technology Press, 1985: 31-130. (in Chinese)
Google Scholar
[5]
Wei Wang, Junhong Li and Ruifeng Ding. Maximum likelihood parameter estimation algorithm for controlled autoregressive autoregressive models. International Journal of Computer Mathematics, 88(16):3458-3467,(2011)
DOI: 10.1080/00207160.2011.598514
Google Scholar
[6]
Yuan Zhe-ming,Zhang Yong-sheng,Xiong Jie-yi. Multidimensional Time Series Analysis Based on Support Vector Machine Regression and Its Application in Agriculture. Scientia Agricultura Sinica, 41(8):2485-2492,2008 (in Chinese)
Google Scholar
[7]
Zhang Yongsheng,Yuan Zheming,Xiong Jieyi,Zhou Tiejun. Multidimensional Time Series Analysis based on Support Vector Regression and Controlled Autogressive and Its Allpication in Ecology,Acta Ecological Sinica,27(6):2419-2424,2007 (in Chinese)
Google Scholar
[8]
Yang Xinrong,Ling Yuhua. Soft-measuring Technique and Its Application for Temperature Measurement in Electrolytic Cell. Journal of Center South University of Technology,34(5):551-554,2003 (in Chinese)
Google Scholar
[9]
Xiang Changsheng,Zhou Ziying. Pest Multiple Dimensional Time Series Forecasting based on SVM.Application Research of Computers, ,27(10):3694-3697,2010 (in Chinese)
Google Scholar