[1]
Wang Jinli,"Application and Integrated Economic Analysis of On-load Capacity Regulating Transformer"[J], High Voltage Apparatus, 2009, 45(3), P32-35
Google Scholar
[2]
Chen Yuguo, Ma Xiaokun, Cui Jianjiang, "S11 Capacity Regulat- ing Transformer"[J], Rural Electrification, 2003, (7), P5-6
Google Scholar
[3]
Yao Zhisong, Yao Lei. "New distribution transformer structures, principles and applications"[M], 2006.
Google Scholar
[4]
Piao Zailin, Wang Dongdong, Zheng Yu. 2010. "Discussion on Arcless On-load Automatic Capacity Regulating Distribution Transformer". Power and Energy Engineeriing Cofference (PEEC 2010):323-326
Google Scholar
[5]
Chen Yuguo, "Principle and Performance Analysis of the Capacity Regulating Transformer "[J], Transformer, 1998, 35(1), P24-25 (Ch)
Google Scholar
[6]
Guoqi,Sun Chunan,Li Donglun, "The Application of Voltage Adjustor to 1 0 kV Distribution Network"[J] Northeast Electric Power Technology2008,(3);12-15
Google Scholar
[7]
Tian Yilin. "Capacity Choice and Economic Effect Analysis on Rural Distribution Transformer" [J]. China Hydropower & Electrification, 2006, (4): 51--56.
Google Scholar
[8]
Zhaogang, Shiwei. "Study On Arcless On-Load Tap Changer"[J]. High Voltage Engineering, 2004, 30(4): 49-51.
Google Scholar
[9]
Wu Wei. "Thyristor On-load Tap Changer"[J]. High Voltage Apparatus. 40(1): 48-49,52. (in Chinese with English abstract)
Google Scholar
[10]
Ren Menggan. "Application study on the system of high voltage valve photoelectricity trigger and online monitoring"[D], Beijing: china electric power research institute,2002.
Google Scholar
[11]
Yang Jie. "Insulation technology of trigger system of 29kV high voltage thyristor valve and over-voltage protection method of thyristor"[J]. Electric Drive For Locomotive, 2000, (2):23-26.
Google Scholar
[12]
LIU Peng, SHEN Ning, YANG Li-na. "Analysis and study of triggering methods of thyristors valve connected in series"[J]. Power Electronics, 2008, 56(2): 42-44
Google Scholar