p.656
p.660
p.665
p.669
p.673
p.677
p.681
p.687
p.692
Simulation System Research on Live Working for 500kV Transmission Line
Abstract:
500kV EHV transmission networks have become the main one of the national grid, carring out live working for 500kV EHV transmission lines is the objective requirements to ensure the stable operation of the grid system. This paper uses a new system to simulate and analyse the way of entering the high electric area on 500kV transmission line. The system has built the ZM1 transmission tower and line model, accurately accounted the complex gap and satety distance. The simulation results show that the system can effectively get the best secure route and determine the way to enter into the equipotential with the safety margin.
Info:
Periodical:
Pages:
673-676
Citation:
Online since:
June 2013
Authors:
Keywords:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: