An Improved Heuristic Algorithm for a Hybrid Flow-Shop Scheduling

Article Preview

Abstract:

This paper presents an improved metaheuristic algorithm to minimize the makespan in a hybrid flow-shop scheduling (HFS) with non-identical parallel machines. First, a mathematical model for an HFS problem is introduced. Second, an improved simulated annealing algorithm (ISAA) which is inspired from a hormone modulation mechanism is presented to retrofit speed and accuracy of the algorithm. Finally, the computer simulation demonstrates the good quality of the proposed procedure, and it outperforms several other algorithms.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1414-1417

Citation:

Online since:

July 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] G.J. Kypasis and C. Kolamas: European Journal of Operational Research Vol. 168 (2006), p.985.

Google Scholar

[2] B.C. Choi and K. Lee: Journal of Combinatorial Optimization Vol. 25 (2011), p.123.

Google Scholar

[3] O. Moursli and Y. Pochet: International Journal of Production Economics Vol. 64 (2000), p.113.

Google Scholar

[4] A. Brahs, J.L. Hunsucken: European Journal of Operational Research Vol. 51 (1991), p.88.

Google Scholar

[5] L. Tang, W. Liu and J. Liu: Journal of Intelligent Manufacturing Vol. 16 (2005), p.361.

Google Scholar

[6] M. Singh and S.S. Mahapatra: International Journal of Advanced Manufacturing Technology Vol. 62 (2012), p.267.

Google Scholar

[7] H.S. Mirsanei, M. Zandieh and M.J. Moayed: Journal of Intelligent Manufacturing Vol. 22 (2011), p.965.

Google Scholar

[8] H.M. Wang, F.D. Chou and F.C. Wu: International Journal of Advanced Manufacturing Technology Vol. 53 (2011), p.761.

Google Scholar

[9] D. Laha and U.K. Chakraborty: International Journal of Automation and Control Vol. 4 (2010), p.359.

Google Scholar

[10] L.S. Farhy: Numerical Computer Methods Vol. 484 (2004), p.54.

Google Scholar

[11] C. Oguz and M.F. Ercan: Journal of Scheduling Vol. 8 (2005), p.323.

Google Scholar