Analysis on Construction Delay of Suburban Roads

Article Preview

Abstract:

As one of large engineering projects, suburban roads plays an important role in urban construction, however, there exists a great many risks in the entire constructing process, which restrict the course of the project in varying degrees. It may cause the construction delay, property loss, and even leave serious quality problems if handled improperly. This paper analyzes the reason of suburban roads construction delay from three aspects which are owner, construction and supervision units, and give some corresponding countermeasures for reference.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2167-2170

Citation:

Online since:

July 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yanzhong Li. Analysis and countermeasures on construction delay [J]. Observation in management, 2011(3), pp.139-141.

Google Scholar

[2] Dilian Tang, Peng Hu, Yinjun Lu. Analyses and thinking on municipal engineering construction delay[J]. The Modern Economy, 2007, 6(9), pp.43-45.

Google Scholar

[3] Huaidong Wang. Project delays [J]. Construction Supervision, 2006, pp.48-50.

Google Scholar

[4] Jianping Pei, Jie Yang, Yuefen Chen. Construction delay events control of supervision engineer [J]. Journal of Pingdingshan institute of technology, 2003, 12(4), pp.64-65.

Google Scholar

[5] Cai Deng. Discussion on resources classification and progress delays in construction management [J]. Theory Research, 2011, (9), p.227.

Google Scholar