The Research of China Made DCS Application on Supercritical and Ultra Supercritical Units of Guohua Electric Company

Article Preview

Abstract:

Guohua electric company use domestic DCS and optimizing control software in four power plants: Taishan,Xuzhou,Chenjiagang and Hulunbeier, there are 2 supercritical uints and 6 ultra supercritical units. During the research, Guohua company help DCS companies to increase quality and lower the risk by compiling and carrying out DCS Factory acceptance standard, Technical guide for logical review of DCS,DCS emergency pre-arranged planning,training I&C staff by virtual DCS simulation machine.The result of above 4 power plants shows that China made DCS could be successfully operation on 1000MW and 600MW ultra supercritical and .supercritical units.

You might also be interested in these eBooks

Info:

[1] LIANG Hua, HU Xiao-hua , FAN Yong-sheng, et al. DCS Factory acceptance standard. Shenhua Beijing Guohua electric power company enterprise standard. Q/SHGHDL0001-(2011).

Google Scholar

[2] HU Xiao-hua , ZHANG Qiu-sheng, FAN Yong-sheng, et al. Technical guide for DCS logical checking. Shenhua Beijing Guohua electric power company enterprise standard. Q/SHGHDL0002-(2011).

Google Scholar

[3] ZHANG Qiu-sheng, YU Xiu-lin, FAN Yong-sheng, et al. Guodian Zhishen EDPF-NT Plus DCS typical emergency response and pre-arranged planning for fossil fuel power plant [M]. China electric power publishing house, (2012).

Google Scholar

[4] ZHANG Qiu-sheng, HUANG-Li, DUAN-Wei, et al. Hollysys MACS-V6 DCS typical emergency response and pre-arranged planning for fossil fuel power plant[M]. China electric power publishing house, (2012).

Google Scholar

[5] PAN Feng-ping, CHEN Xiao-qiang, ZHENG Shao-peng, et al. Guohua Taishan power plant 2×1000 MW construction projects Unit 7 I&C commissioning report[R]. Guangdong electric power research institute, 2011, 8.

Google Scholar

[6] PAN Feng-ping, CHEN Xiao-qiang, ZHENG Shao-peng, et al. Guohua Taishan power plant Unit 6 runback tests report[R]. Guangdong electric power research institute, 2011, 3.

Google Scholar

[7] LU Liang, LI Guang. Guohua Xuzhou power plant 2×1000MW construction projects Unit 2 I&C commissioning report[R]. Shanghai electric power commissioning institute, 2012, 1.

Google Scholar