[1]
W. Wang, Zh. M. Huang, Ch. He, et al. [J]. Automation and Instrumentation,2012,(9):1-5. In Chinese.
Google Scholar
[2]
N. Ye, P. Banerjee, A. Banerjee, et al. A Comparative Study of Assembly Planning in Traditional and Virtual Environments[C]. IEEE Transactions on System, Man, and Cybernetics-Part C: Applications and Reviews, 1999, 29(4): 546-555.
DOI: 10.1109/5326.798768
Google Scholar
[3]
W.B. LEE, H.C.W. LAU. [J]. International Journal of Agile Management Systems, 1999, 1(02):83-87.
Google Scholar
[4]
L. Sh. Sun, R. X. Ning, X. Y. Wang, et al. [J]. Journal of Beijing Institute of Technology, 2002,22(1):32-35. In Chinese.
Google Scholar
[5]
W. Wang, Ch. He, Q.Y. Liu, et al. [J].Machinery and Electronics,2012,(4):3-6. In Chinese.
Google Scholar
[6]
T.S. Mujber, T. Szecsi, M.S.J. Hashmi. [J]. Journal of Materials Processing Technology, 2004, 155-156:1834-1838.
DOI: 10.1016/j.jmatprotec.2004.04.401
Google Scholar
[7]
D. Schaefer, C. Borgmann, D. Scheffter. Factory Planning and the Potential of Virtual Reality[C]. Conference at Chalmers, Gothenburg, Sweden, 2001.
Google Scholar
[8]
C. Shukla, V. Michelle and F.F. Chen. [J]. Computers and Industrial Engineering, 1996, 10: 79-82.
Google Scholar
[9]
S.G. Robinson. Simulation Model Verification and Validation: Increasing the Users confidence[C]. Winter Simulation Conference Proceedings, Birmingham, UK, 1997.
DOI: 10.1145/268437.268448
Google Scholar
[10]
X.N. Li, H.B. Yuan, X. Y. Huang, E.H.M. Cheung. [J]. Journal of Materials Processing Technology, 1998, 76(3):238-245.
Google Scholar
[1]
Christiand, J. Yoon. [J]. Robotics and Computer-Integrated Manufacturing, 2011, 4: 306-317.
Google Scholar
[12]
Y.M. Ma, L. Q. Fan, H. Zhang, et al.[J]. Manufacturing Automation, 2004, 26(10):17-19.In Chinese.
Google Scholar
[3]
M. Ozden. A New Optimization Heuristic for Continuous and Integer Decisions with Constraints in Simulation[C].Proceedings of the 2005 Winter Simulation Conference,2005: 853-856.
DOI: 10.1109/wsc.2005.1574331
Google Scholar
[4]
W. D. Liu, J. X. Liu, Bo. Yan, et al. [J]. Mechanical Research and Application, 2005, 18(2):10-12. In Chinese.
Google Scholar
[5]
M. Spiegel, P.F. Reynolds. A Case Study of Model Context for Simulation Composability and Reusability[C]. Proceedings of the 2005 Winter Simulation Conference,2005:437-444.
DOI: 10.1109/wsc.2005.1574279
Google Scholar
[16]
E. Gune, R. Szechtman. A Simulation of A Helicopter Ambulance Service[C]. Proceedings of the 2005 Winter Simulation Conference,2005:951-957.
DOI: 10.1109/wsc.2005.1574344
Google Scholar
[17]
W. Wang, B. Wu, Y. M. Hu, et al. Virtual Simulation Applications in Manufacturing Process of High-speed Trains[C]. Advanced Materials Research, 2013, 622-623:575-580.
DOI: 10.4028/www.scientific.net/amr.622-623.575
Google Scholar
[18]
L. Xu, W.F. Li, Zh. H. Shi, et al. [J]. Machine Tool and Hydraulics,2004,(8):63-65.In Chinese.
Google Scholar
[19]
W. Ai, J. F. Liu, H. H. Wang, et al. [J]. Computer Engineering and Applications, 2003, 39(9):32-34,94.In Chinese.
Google Scholar
[20]
L. J. Jiang, Zh.L. Li. [J]. Journal of South China University of Technology(Natural Science Edition),2007,35(3):47-52.In Chinese.
Google Scholar
[21]
J. P. Ma, X. J. Zhou, L. Pan, et al. [J]. Journal of East China Jiaotong University, 2006, 23(2):125-128.In Chinese.
Google Scholar
[22]
J. Y. Qi, Ch. A. Zhu. [J]. Machinery Design & Manufacture, 2010, (4):113-115.In Chinese.
Google Scholar
[23]
L.Q. He, Sh. Sh. Wei, Y. J. Li, et al. [J]. Journal of Shandong University(Engineering Science), 2003, 33(3): 314-319. In Chinese.
Google Scholar
[24]
Y. Liu, D. C. Wang, Zh.Ch. Feng, et al. [J]. Journal of Southwest China Normal University (Natural Science Edition), 2005, 30(6): 1019-1025.In Chinese.
Google Scholar
[25]
W.B. Lee, C.F. Cheung, J.G. Li. [J].Journal of Materials Processing Technology, 2001, 113:416-423.
Google Scholar
[26]
Y. Zhong, W. Ma, B. Shirinzadeh. [J].Robotics and Computer-Integrated Manufacturing,2005:21(6): 528-549.
Google Scholar
[27]
D.R. Kalasky, G.A. Levasseur. Using SIMPLE++ for Improved Modeling Efficiencies and Extending Model Life Cycles. [C]. Simulation Conference, 1997, Proceedings of the 1997 Winter.2001:611-618.
DOI: 10.1145/268437.268593
Google Scholar
[28]
R. Tesic, P. Banerjee. [J].Journal of Manufacturing Systems,1999,18(5): 367-376.
Google Scholar
[29]
S. Jayaram, H.I. Connacher, K.W. Lyons. [J]. Computer-Aided Design, 1997,4:575-584.
Google Scholar
[30]
Y. Kim, J. Yang, S. Han. [J]. Computers in Industry, 2006,57(7):653-662.
Google Scholar
[31]
Y. Guo, W. Liao, X. Cheng, L. Liu. [J]. Simulation Modeling Practice and Theory, 2006,14(5):577-585.
Google Scholar
[32]
G. L. Xiong, X. Wang. [J]. Journal of System Simulation, 1999, 11(3):145-151. In Chinese
Google Scholar
[43]
W. Wang, Ch. He, Q.Y. Liu, et al. Research on assembly shop scheduling problem based on genetic Algorithm[C]. Machinery and Electronics, pp.3-6, April, 2012.
Google Scholar
[34]
U. Bracht, T. Masurat. [J]. Computers in Industry, 2005, 56(4): 325-333.
Google Scholar
[35]
J. Zhou, Zh.Q. Liu, J.X. Deng, et al. [J]. Manufacturing Technology & Machine Tool, 2005(1): 13-18. In Chinese.
Google Scholar
[36]
P. Legato, R.M. Mazza. [J].Europe Journal of Researc, 2001, 133(6):537-547.
Google Scholar
[37]
D. Joslin, W. Poole. Agent-based simulation for software project planning[C]. Proceedings of the 2005 Winter Simulation Conference, 2005:1059-1066.
DOI: 10.1109/wsc.2005.1574359
Google Scholar