Study on Sustainable Integrated Program of Dump Open Pit Optimization

Article Preview

Abstract:

According to the various influencing factor of the dumping plan choice, the fuzzy comprehensive evaluation model is built up, which is based on the fuzzy mathematics theories, the dumping plan is optimized. And take a mine as an example, the tool of computer aided design is used to rebuild the dumping plan, and great economic benefit is obtained.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

250-254

Citation:

Online since:

July 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Deqing Gan: Rock the abandoned Simulation and Optimization. Master's thesis of the Beijing University of Science and Technology. 7(2), 90-99 (1993).

Google Scholar

[2] Zhongqiu Lin: Single-objective and multi-target system linear programming. Shanghai: Tongji University Press. 8(2), 12-19 (1980).

Google Scholar

[3] Lunbiao Yang, Yingyi Gao: The principle of fuzzy mathematics. Guangzhou: South China University of Technology Press. 3(4), 89-97 (1998).

Google Scholar

[4] Wenxiu Li: Fuzzy Theory in the mining and geotechnical applications. Beijing: Metallurgical Industry Press. 3(7), 23-28 (1998).

Google Scholar

[5] Xu Xing-hua, BaiI Feng-yi, Hua Ben-ling: Analysis and improvement measures of safety & stability of Sangyuan Dumping Site. Mining Engineering. 3(2), 49-51 (2012).

Google Scholar