Study on the Bi-Level Optimization Model of Active Distribution Network

Article Preview

Abstract:

Active distribution network can realize the grid-connected operation of the large-scale intermittent power, and thus ensure the profits of the DG operators. It can also help to defer the investment for the power grid construction, reduce the standby power capacity, and improve the power supply reliability rate. Active distribution network planning should not only consider the content of the traditional distribution network planning, but also consider the influence of distributed generation output and demand side response regulation. Based on these prerequisites we establish a bi-level optimization model of active distribution network planning in this paper. From the perspective of saving investment for the electric power company, we use a function to minimize the total cost of the planning scheme, including both the plan and operation cost, with the consideration of a series of constraints such as DG and DSR. Hence we establish a bi-level optimization planning process of the active distribution network based on genetic algorithm.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1389-1392

Citation:

Online since:

July 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] You Yi, Liu Dong, Yu Wen-peng, et al. Technology and Its Trends of Active Distribution network. Automation of Electric Power Systems, 2012, 36(18): 10-16 (in Chinese).

Google Scholar

[2] G. Celli, F. Pilo, G. Pisano, G. G. Soma, Optimal planning of active networks, in Proc. of 16th PSCC Conf., Glasgow, (2008).

Google Scholar

[3] G. Celli, M. Loddo, F. Pilo, Distribution Network Planning with Active Management, in Proc. of 6th WESC Conf., Torino (Italy), July (2006).

Google Scholar

[4] F. Pilo, V. Allegranza, G. Celli, R. Cicoria and S. Mocci, An Integrated Tool for Optimal Active Network Planning, in Proc. 2003 CIRED Conf., paper n. 64.

Google Scholar

[5] Maifeld T. T. ,Sheble G. B. Genetic-based unit commitment algorithm [J]. IEEE Transactions on Power Systems. 1996,11(3):1359-1370.

DOI: 10.1109/59.536120

Google Scholar

[6] Mantawy A. H. A genetic-based algorithm for fuzzy unit commitment model [C]. Seattle, WA, USA. 2000: 250-254.

Google Scholar

[7] Fung C. C., Chow S. Y., Wong K. P. Solving the economic dispatch problem with an integrated parallel genetic algorithm [M]. Perth, WA, Australia. 2000: 1257-1262.

DOI: 10.1109/icpst.2000.898150

Google Scholar

[8] Tippayachai J. , Ongsakul W. , Ngamroo I. Parallel micro genetic algorithm for constrainedeconomic dispatch [J]. IEEE Transactions on Power Systems. 2002, 17(3): 790-797.

DOI: 10.1109/tpwrs.2002.800948

Google Scholar

[9] Yao Wei-feng, Zhao Jun-hua, Wen Fu-shuan, et al. A Charging and Discharging Dispaching Stratege for Electric Vehicle Based on Bi-level Optimization. Automation of Electric Power Systems, 2012, 36(11): 30-36 (in Chinese).

Google Scholar