Impact Analysis on Construction Control of Pre-Camber for Long-Span Continuous Rigid Frame Bridge in Winter Intermission

Article Preview

Abstract:

Cantilever casting construction has been commonly used in construction of continuous rigid frame bridge and the implementation of construction control plays an important role in ensuring the line-type of built bridges and the forced state in construction stage is within the design requirements range. It tends to construct across the winter possibly. Based on an analysis of a typical continuous rigid frame bridge construction stage, this paper takes the impact of winter intermission on pre-camber in construction stage into consideration and the research has guiding significance for the construction of the similar bridge to a certain degree.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

27-29

Citation:

Online since:

July 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Liu Shan. Structural Analysis and Current Situation of Construction Control of Continuous Rigid Frame Bridge[ J]. Tibet's Science and Technology, 2011, (1): 47-48.

Google Scholar

[2] Zhang Yongshui, Cao Shushang. Research on Linear Control of Continuous Rigid Frame Bridge[ J] . Journal of China & Foreign Highway, 2006, 26(6): 83-86.

Google Scholar

[3] Gao Dafeng, He Chengxin, etc. Recognition of Temperature Parameters in Control of Concrete Bridge Construction in Winter [ J]. Tibet's Science and Technology, 2012, 21(3): 213-215.

Google Scholar

[4] Xiang Zhongfu. Control Technique for Bridge Construction[M]. Beijing: China Communications Press, (2001).

Google Scholar

[5] Ministerial Standard Issued by the Ministry of Communications of PRC. General code for design of highway Bridges and Culverts(JTG D60-2004)[S]. Beijing: China Communications Press, (2004).

Google Scholar