Transmission Network Planning Model Considering Risk Constraint

Article Preview

Abstract:

This paper has discussed the treatment of uncertainty in the market environment, using chance-constrained programming to describe the risk and Monte Carlo simulation method to calculate the risk factor, the risk factor is bound to establish transmission network flexible planning model, the result is a transmission planning of minimum comprehensive cost under uncertain environment for the future program.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1415-1418

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] LIU Kai-ying, CAI Shu-tao, ZHANG Yao, The Power Network Planning Method Based on Risk Evaluation, Chinese Journal of Electrical Engineering, 2007,27(22).

Google Scholar

[2] Yang Ning, Wen Fushuan, Transmission system expansion planning method based on chance constrained programming, Automation of Electric Power Systems, 2004,28(14).

Google Scholar

[3] Yang Ning, Wen Fushuan, Multistage transmission system expansion planning considering risk-constrained; Automation of Electric Power Systems, 2005,29(4).

Google Scholar

[4] Zeng Qingyu, transmission planning, coordination and operational modes under the condition of electricity market , Automation of Electric Power Systems, 2004,28(5).

Google Scholar

[5] Wang Xifan, Power system planning, Beijing, Water Conservancy and electric power press, (1990).

Google Scholar

[6] Ma Changhui, Xue Yusheng, Wang Xiaoying, Transmission planning based on static and dynamic security risk, Automation of Electric Power Systems, 2006, 30(14).

Google Scholar