The Post Ability Evaluation of Maintenance Personnel Based on the G1-Topsis Algorithm

Article Preview

Abstract:

The Topsis algorithm was applied to evaluate the post ability of maintenance personnel, and an index system for the evaluation was established. In order to avoid the inconvenience of AHP method in actual operation, a G1-Topsis combination algorithm with the weight of each index calculated by G1 method was proposed. It can be seen from the analysis of examples that the post ability evaluation of maintenance personnel was treated effectively. The results were consistent with the actual situation, which provided important basis for the evaluation and promotion of maintenance personnel.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

3051-3055

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Luo S P. Post competency to performance excellence. Beijing: Machinery Industry Press, (2008).

Google Scholar

[2] Lei B, Zhang L, Xia T T, Wu Y K, Fan L. Quality evaluation model based on analytic hierarchy process of Chongqing rural ecological environment. Journal of Beijing University of Technology, 2011, 37 (9): 1393-1399.

Google Scholar

[3] Wang J C, Xi L, Zhao X L, Ma X M, Cao D L, Xu X. Data visualization of leaf color model based on fuzzy comprehensive evaluation. Journal of Agricultural Engineering, 2011, 27(11): 155-159.

Google Scholar

[4] Chen S J, Hwang C L. Fuzzy multiple attribute decision making methods and applications. New York: Springer, (1992).

Google Scholar

[5] Liu J L, Fang Z. Durability comprehensive evaluation based on gray relational degree curved arch bridge in service. Journal of Hunan University (NATURAL SCIENCE EDITION), 2010, 37(9): 1-6.

Google Scholar

[6] Jie W, Sun J S,Yong Z,Liang L. Ranking approach of cross-efficiency based on improve TOPSIS technique. Journal of Systems Engineering,2011, 22 (4), 604-608.

DOI: 10.3969/j.issn.1004-4132.2011.04.008

Google Scholar

[7] Zhang L H, Chen J, Liu X Q. Evaluation method of the principal component of the combination of the performance of listed companies. Statistics and Decision, 2009, 17: 185-186.

Google Scholar

[8] Hua X Y, Tan J X. TOPSIS method based on the vertical plane - orthogonal projection. Systems engineering theory and Practice, 2004, 1: 114-119.

Google Scholar

[9] Ye F, Sun D C. The fuzzy optimization method for multi-index decision. Industrial Engineering, 2000, 3(3): 43-46.

Google Scholar

[10] Cui H R, Liang L H, Wang L H. Reliability assessment index system of electricity distribution network based on the entropy weight TOPSIS analysis. Journal of Agricultural Engineering, 2011, 27(1): 172-175.

Google Scholar

[11] Yu J X, Tan Z D. Research on quantificational performance evaluation based on combination weighting and Topsis. Systems engineering theory and Practice, 2005, 11, 46-50.

Google Scholar

[12] Guo Y J, Pan D H. New algorithm for a class of decision problems. Decision and decision support system, 1992, 2(3): 56-62.

Google Scholar