The Alignment Control of Large-Span Continuous Beam Bridge Cantilever Construction Method

Article Preview

Abstract:

One long-span bridge adopted the cantilever casting method, which is pre-stressed concrete variable cross-section continuous box girder structure. In the construction process, due to the concrete pouring, hanging basket moving, construction loads, pre-stressed tension, concrete shrinkage and creep, temperature, humidity and many other factors. There will be such problems of cantilever beam segment closed error and the bridge line-type do not coincide in design goals. In this paper, we use the bridge dedicated finite element program MIDAS / Civil procedural for modeling and structural analysis. Analyze the problems of deflection control and pre-camber adjustment of cantilever construction, in order to ensure that the bridge closure smoothly in accordance with the design standards.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1226-1230

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Bang An, Yongshui Zhang. Bridge construction monitoring and control [M]. Beijing: Mechanical Industry Press, 2005. In Chinese.

Google Scholar

[2] Guimei Zhou. Linetype control technology in continuous girder bridge cantilever construction[J]. Railway Engineering, 2008. In Chinese.

Google Scholar