Analysis on Stiff Frame in Replacement of Closure Segment for Prestressed Concrete Cable-Stayed Bridges

Article Preview

Abstract:

Stiff frame was the important structural member in construction of replacement of closure segment for prestressed concrete cable-stayed bridges. To establish the design calculation method of it and reveal its variation of internal forces with construction stages of replacement, some configurations and its working process of stiff frame was introduced. Based on construction stage analysis of replacement, calculation methods of its strength and stability were given. Through FEM results, influence of stiff frame to structural dynamic property and global stability of whole bridge were described. Analysis results showed, it was appropriate to consider each section steel of stiff frame as eccentric compression member. During construction, the transversal global property of stiff frame and the security of its link with main girder must be valued. Construction results also proved, the theoretical calculation method could reflect the actual structural state of stiff frame, and its result was conservative. Analysis on stiff frame was an important part of replacement of closure segment, and could provide ways and references for construction control of replacement of closure segment.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1423-1431

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Hong-jiang LI, Status and Development of Technologies of Maintenance and Strengthening for Existing PC Cable-Stayed Bridges, Proceedings of the 10th International Conference of Chinese Transportation Professionals. Beijing, China, vol. 382, pp.3670-3677, August (2010).

DOI: 10.1061/41127(382)396

Google Scholar

[2] Hongjiang LI, Wanheng LI, Jinquan ZHANG, et al, World Bridges, vol. 37, pp.53-56, January, 2009 (in Chinese).

Google Scholar

[3] Xi-chun DU, Study of closure technics for long span PC bridges of rigid frame combined continuous beam. Wuhan: Wuhan University of Technology, 2006 (in Chinese).

Google Scholar

[4] Xin-yu ZHANG, Hong-ji LANG, Qing-dong SUN, et al, Bridge Construction, vol. 34, pp.11-13, April 2004 (in Chinese).

Google Scholar

[5] Zhi-hui LIU, Journal of China & Foreign Highway, vol. 22, pp.92-93, May 2002 (in Chinese).

Google Scholar

[6] Code for Design of Highway Reinforced Concrete and Prestressed Concrete Bridges and Culverts (JTG D62-2004) (in Chinese).

Google Scholar

[7] Guidelines for Design of Highway Cable-stayed Bridge (JTG/T D65-1-2007) (in Chinese).

Google Scholar

[8] Hong-jiang LI, Rong-xia WANG, Lei WANG, Journal of Shandong Jianzhu University, vol. 25, pp.405-409, April 2010 (in Chinese).

Google Scholar

[9] Hong-jiang LI, Wan-heng LI, Jin-quan ZHANG, et al, Analysis on dynamic characteristics of Tianjin Yonghe Bridge after maintenance, The conference proceedings of Strengthening, retrofit, and evaluation for existing bridges in China, Beijing, vol. 1, pp.50-54.

Google Scholar

[10] Hongjiang LI, Xindai ZUO, Hanwan JIANG, et al, Journal of Wuhan University of Technology(Transportation Science & Engineering), vol. 34, pp.869-872, May 2010 (in Chinese).

Google Scholar

[11] Hong-jiang LI, Wan-heng LI, Jin-quan ZHANG, et al, Journal of Highway and Transportation Research and Development, vol. 25, pp.61-66, August 2008 (in Chinese).

Google Scholar