p.1321
p.1325
p.1329
p.1335
p.1339
p.1345
p.1353
p.1359
p.1364
Direct Calculation Formulae for Critical Depth of II Type Horseshoe Tunnel with Flat-Bottom
Abstract:
Abstract: II type horseshoe with flat–bottom evolved from standard II type horseshoe cross-section. It is composed of a flat-bottom and three arc sections. It is commonly applied in the field of hydroelectric engineering. The critical depth computation equation for II type horseshoe cross-section with flat–bottom tunnel is a transcendental equation and no analytic solution. In this paper, based on the mathematics transformation for the basis equation and the relationship analysis between the dimensionless critical depth and the relative parameters, a direct solution is established for the calculation of critical depth for II type horseshoe cross-section with flat–bottom tunnel according to the fitting principle. This method overcomes the shortage of other iterative trial calculating methods, such as complex calculation step, depend on the special chart and curve, and existed serious error. The formula is simply and the maximum error is less than 0.515% under the general engineering design range (ratio of critical depth and arch radius is located between the 0 - 1.60).
Info:
Periodical:
Pages:
1339-1344
Citation:
Online since:
August 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: