Contrastive Analysis between Shifosi Reservoir Impoundment Test and Numerical Simulation Results

Article Preview

Abstract:

Using numerical simulation method for project simulating prediction, the built mathematical models of actual conditions often need to be generalized, consequently, there are some inevitably deviations between model prediction results and the measured data, which requires the adjustment of model parameters to improve the model. This paper made a comparative analysis of Shifosi reservoir impoundment test observation water levels and model prediction water levels, adjust the model parameters and boundary conditions, then it would get the sensitive parameters that affect the accuracy and stability of numerical model and boundary condition and improve the fitting degree of measured data and simulation results.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2600-2603

Citation:

Online since:

August 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wu Yongpu, Pan Jun , Lin Congli, etal: Water Resources & Hydropower of Northeast China. Vol. 26(2008), pp.21-23.

Google Scholar

[2] Pan Jun, Chen xin, Sun Caizhi: Hydrogeology & Engineering Geology. Vol. 2(2004), pp.67-71.

Google Scholar

[3] Wei Linhong, Su Canglong, Hao Zhenchun: Journal of Chongqing university (Natural Science). Vol. 23(2000), pp.50-52.

Google Scholar

[4] Yang Wei , Ding Bin, Wang Ende , etal: Journal of Shenyang Jianzhu university (Natural Science). Vol. 20(2004), pp.325-328.

Google Scholar

[5] Liu Qixia, Li Qingbo, Zou Jianfeng, in: Environmental engineering geology, edited by The Yellow River water conservancy publishing, Zhengzhou, China(2001), in press.

Google Scholar

[6] MOHAMED A, DAWOUD, AHMED R. ALLAM: Water Resources Management. Vol18(2004), p.321–337.

Google Scholar