Elastic-Plastic Analysis of Peak Stress of Anchor in Circle Tunnel

Article Preview

Abstract:

In this paper,the rule of direct proportion between anchor stress and creep strain of rock mass is taken as a starting point. After tunnel excavation,stress distribution of anchor in perfect circle tunnel is analyzed,then an important conclusion that the location is coincident between peak stress of anchor and plastic zone border of rock mass can be drawn in terms of theoretical derivation when rock mass is in plasticity.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

40-43

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Phillips SHE. Factors affecting the design of anchorages in rock, Cementation Research Ltd., London(1970).

Google Scholar

[2] CHENG Liangkui. Research and new progress in ground anchorage. Chinese Journal of Rock Mechanics and Engineering, 21, 24(2005).

Google Scholar

[3] LI Yingyong, WANG Mengshu, ZHANG Dingli, ZHANG Sifeng. Study on influential factors and model for variation of anchor cable prestress. Chinese Journal of Rock Mechanics and Engineering, s1, 27(2008).

Google Scholar

[4] ZHOU Yongjiang, HE Siming, YANG Xuelian. Study on prestress loss of anchor cables under long-term loading. Rock and Soil Mechanics, 8, 27(2006).

Google Scholar

[5] LI Jianlin, DENG Huafeng, HUANG Jianwen, et al. Analysis of factors affecting prestress losses of unloading rock mass. Rock and Soil Mechanics, S1, 26(2005).

Google Scholar

[6] Xu Hongfa, Lu Hongbiao, Qian Qihu. Creep damage effects on pulling grouting anchor in soil. Chinese Journal of Geotechnical Engineering, 1, 24(2002).

Google Scholar