The Maturity Model Research of Construction Project Management Informationization

Article Preview

Abstract:

Construction project management informatization (CPMI) is an effective application of information technology in the construction project management and in line with the requirements of the construction industry informatization development by the Ministry of Construction. However these is still no very effective methods and standards for measuring and evaluating CPMI level. Taking advantage of software managing capability maturity model, combining with the characteristics of construction engineering project, this paper will design maturity standards of CPMI and also CPMI evaluating model with multi indicators; at the same time the entropy weight fuzzy comprehensive evaluation method will be used for evaluating.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2222-2227

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Changbo Qiu, Jia Zhang. Enterprise information maturity stage classification model: Journal of Jilin university(engineering) Vol. 37(2007), pp.976-980(in Chinese).

Google Scholar

[2] Yushun Fan. Enterprise information management strategic framework and the maturity model: Computer integrated manufacturing system Vol. 14(2002), pp.1290-1293(in Chinese).

Google Scholar

[3] Xingyuan Wang, Tao Cheng. The development model and its level index of Informatization of enterprises. Journal of Shandong University(Engineering Edition), 2002, 32(4), pp.337-341(in Chinese).

Google Scholar

[4] Informatization and management reform, edtied by Zhongtuo WANG Publications/Dalian University of Technology Press, Dalian(2000), in press(in Chinese).

Google Scholar

[5] Wei Zhang, Kouhua Qiu. Project management maturity model and its application research: Journal of Beijing university of aeronautics and astronautics (social science edition) Vol. 20(2007), pp.18-21(in Chinese).

Google Scholar

[6] Xin Li. Project management maturity and its evaluation methods : Project management techniques, Vol. 4(2004), p, 24-26(in Chinese).

Google Scholar