[1]
Turner J.R. The handbook of Project-based Management. New York; McGraw-Hill, (2008).
Google Scholar
[2]
Mats Engwalla, Anna Jerbrant. The resource allocation syndrome: the prime challenge of multi-project management[J]. International Journal of Project Management 21(3003) 403-409.
DOI: 10.1016/s0263-7863(02)00113-8
Google Scholar
[3]
Pritsker,A. A. B, Watters L.J., Wolfe P.M. Multiproject scheduling with limited resource: A zero-one programming approach. Management Science, (1969), 16(1); 93-108.
DOI: 10.1287/mnsc.16.1.93
Google Scholar
[4]
WeixinWang, YuanLi. Multi-project resource leveling and its genetic algorithm [J]. Application Research of Computers, (2006), 23(12); 46-47; In Chinese.
Google Scholar
[4]
Chiu,H. N. , Tsai,D. M. An efficient search procedure for the resource constrained multi-project scheduling problem with discounted cash flows[J]. Construction Management and.
DOI: 10.1080/01446190110089718
Google Scholar
[6]
YeTan, Weijun Zhong, Nanrong Xu, The two-level decision making of allocating multiple resources to several projects [J]. Journal of systems engineering, (1999); In Chinese.
Google Scholar
[7]
GONCALVES J F, MENDES J J M, RESENDE M G C. A genetic algorithm for the resource-constrained multi-project scheduling problem[J]. European Journal of Operation Research, (2007).
Google Scholar
[8]
Ying Ying, Chung Yi Shou Chung, Min Li. A hybrid genetic algorithm of resource constrained multi-project scheduling [J]. Zhejiang University (Engineering Science), (2009); 32-36; In Chinese.
Google Scholar
[9]
Hartmann,S. A competitive genetic algorithm for resource-constrained project scheduling. Naval Resource Logistics, (1998), 45(7): 733-750.
DOI: 10.1002/(sici)1520-6750(199810)45:7<733::aid-nav5>3.0.co;2-c
Google Scholar