The Application of Earned Value Management in Small and Medium-Sized Hydropower Stations Project

Article Preview

Abstract:

Earned value management is a prerequisite for the wide range of applications in the practice of project management at home and abroad. In this paper, As to the quality of the target cost and schedule goal, To the project cost and schedule performance evaluation, On the basis of reading the relevant literature and researching at home and abroad. Using theory and method, which cost and schedule performance evaluation of earned value management as the research object. Application of project management software, It is greatly meaningful to applying earn value management model to small and medium-sized hydropower stations project.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2371-2378

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Anbari F, Earned value method and extensions. Project Manage J 2003;34(4):12– 23.

Google Scholar

[2] NASA, Office of the Secretary of Defense and National Aeronautic and Space Administration. DOD and NASA Guide PERT/ COST, Washington, DC. (1962).

Google Scholar

[3] Fleming, Quentin W, Cost/Schedule Control Systems Criteria:The Management Guide to C/SCSC, Chicago, Illinois:Probus Publishing Company, (1992).

Google Scholar

[4] Fleming, Quentin W, and Joel M. Koppelman, Earned Value Project Management—A Powerful Tool for Software Projects, Crosstalk the Jounal of Deffence Software Engineering, July (1998).

Google Scholar

[5] Yongzhen Yan, Ming Bai. Establishing Earned Value Management of Schedule and Cost Control System Integration Project, Optimization of Capital Construction[J] 2004 5. In Chinese.

Google Scholar

[6] Deying Hu, Application of earned value assessment principles of the implementation of the project cost / schedule control, Chemical Engineering Design [J], 1994. 2:46— 51. In Chinese.

Google Scholar

[7] Songjiang Wang, Project Oriented Enterprise Comprehensive Management of Innovation, Yunnan Science and Technology Press, 2008, 12. In Chinese.

Google Scholar

[8] Project Management Institute, A Guide to The Project Management Body of Knowledge, PMI Standard Cotninlttee, (2008).

Google Scholar

[9] Xinxing Luo, Weihua Miao , Basic theory and practical application of the Earned Value Measure, Journal of Central South University(Social Science), 2003, 3:369— 372. In Chinese.

Google Scholar

[10] Zefu Lin, The Study on the Application of EVM—Experience, Problem and Drive Factors Science of Science and Management of S. & T., [J] 2007-(07):72-76. In Chinese.

Google Scholar

[11] Christensen. David. The Costs and Benefits of the Earned Value Management Process [C]. Acquisition Review quarterly, 1998, 5(3): 373- 386.

Google Scholar