Research on Construction Cost Control of Contestable Measure Items - Taking a Project in Shijiazhuang as an Example

Article Preview

Abstract:

Beginning from the definition and cost of measure item fee, analyzes the significance of construction cost control of contestable measure items. Measures of cost control are summarized from five perspectives of specific construction plansformulation, materials, machinery, labor and management-with combination of specific projects, so as to provide reference for cost control in projects.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2555-2559

Citation:

Online since:

August 2013

Keywords:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Dongzhi Sun, Safety technology and management of construction [M]. Shijiazhuang: Hushan Culture& Arts Publishing House, 2008, pp.107-111.

Google Scholar

[2] Yisheng Liu. Basic theories and relevant regulations of construction cost management [M]. Beijing: China Plan Publishing House, 2010, pp.141-146.

Google Scholar

[3] Xueying Bao. Construction Cost Management [M]. Beijing: China Railway Publishing House, 2010, pp.32-35.

Google Scholar

[4] Ministry of Construction of the People's Republic of China. Standard of Valuation Mode of BOQ in Construction Works GB50500-2008 [S]. Beijing: China Plan Publishing House, (2008).

Google Scholar