Reference to Similar Work in the 99 Version of the FIDIC Construction Contract Change Valuation Methods to Improve Research
Abstract:
Variations are ubiquitous during the building period of construction projects, and their impact on the cost of projects has been confirmed by theory and practice. Therefore, engineers should determine the rates of variation accurately. Under the Conditions of Contract for Construction (FIDIC 99), the paper studied how to determinate variation rates with reference to similar work, which included defining similar work and determining new rates with reference to similar work.