Experimental Study on Feasibility of New Scaffold Construction Scheme in Preventing Fire Spread

Article Preview

Abstract:

Aiming at the problem of fire risk of the traditional scaffold construction scheme, a new type of scaffold construction scheme was proposed. In the vertical layout of scaffold board, this scheme alternately arranged to take the "two layers of bamboo fence one layer steel fence". In order to verify the feasibility of the prevention of the spread of fire about the new scaffold construction scheme, three groups of fire experiments were designed. By the analysis of experimental phenomena and data results, it is concluded that the steel fence boards used as isolation layers in the new scaffold construction scheme can effectively mitigate the risk of fire spreading upward or downward along the burning scaffold.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

415-420

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Fengzhu Lu, Youming Yu, Biheng Huang: Journal of Bamboo Research, Vol. 24(2005), p.45.

Google Scholar

[2] Fengzhu Lu, Yuebiao Xu, Jun Qian: Journal of Zhejiang Forestry College, Vol. 22(2005), p.198.

Google Scholar

[3] Fengzhu Lu, Fei Chen, Lingfei Ma. Forest Research, Vol. 20(2007), p.726.

Google Scholar

[4] Weicheng Fan: Fire Risk Assessment Methodology(Science Press, Beijing 2004).

Google Scholar

[5] Ran Huo: Performance-based Building Fire Safety Analysis and Design(Science Press, Beijing 2001).

Google Scholar

[6] YinQing Li: Building Performance-based Fire Design(Chemical Industry Press, Beijing 2005).

Google Scholar