p.905
p.909
p.917
p.921
p.928
p.935
p.939
p.944
p.949
Strain Analyzing of Concrete Creep of Xiaolangdi Sediment Tunnel Lining over Tensioning and Operation Periods
Abstract:
Xiaolangdi sediment tunnel is the first waterway engineering used un-bonded circumferential pre-stressed lining in China. Based on data obtained by concrete strain meters over tensioning and operation periods, strain of concrete creep of sediment tunnel lining was analyzed. The results show that concrete creep developed over tensioning period is 26.4% of total strain and 35.8% of elastic strain respectively; Creep strain had a good linear relation with pre-stress and loading time and can be calculated by εc=ασiti , which are agree with the measured results; Over operation period, concrete creep strain can be analyzed by rejecting the effect of temperature and water level from the total strain.
Info:
Periodical:
Pages:
928-931
Citation:
Online since:
August 2013
Authors:
Keywords:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: