Investigation on Closure Temperature of Long-Span Pre-Stressed Concrete Continuous Rigid-Frame Bridge

Article Preview

Abstract:

Based on a long-span pre-stressed concrete continuous rigid frame bridge, the Chaoyangsi bridge, the influence on stress and deformation of the girder caused by different closure temperature was analyzed. With the aided platform Midas/Civil, comparative analysis of three different closure temperatures was carried on to determine the reasonable one. It is concluded that different closure temperature has important influence on girder stress, but the most dangerous stress combination of girder under serviceability limit state could be taken as remain the same. Though different closure temperature has little influence on the displacement of girder, it is recommended to pay highly attention to the influence on the mid-span vertical displacement when doing the formwork. And finally this article puts forward some effective measures to prevent and reduce the temperature effect.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1325-1328

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Ministry of Communications of the People's Republic of China: JTG D60-2004 General Code for Design of Highway Bridges and Culverts (China Communications Press, Beijing 2004). (In Chinese).

Google Scholar

[2] Junlan Xun: Construction Controlling of the Large Span Bridge (China Communications Press, Beijing 2000). (In Chinese).

Google Scholar

[3] Xingfa Liu: Analysis of the Temperature Effect for Concrete Structure (China Communications Press, Beijing 1991). (In Chinese).

Google Scholar

[4] Lichu Fan: Bridge Engineering (China Communications Press, Beijing 2008). (In Chinese).

Google Scholar

[5] Shenglu Song:Research on Temperature Effect of the High-pier Long-span Continual Rigid Frame Bridge. Master Thesis, Hunan University, Changsha, 2008. (In Chinese).

Google Scholar

[6] Tangke Ma: The Static Analysis and Temperature Effect of Span Pre-stressed Concrete Continuous Rigid Frame Bridge. Master Thesis, Changsha University of Science and Technology, Changsha, 2012. (In Chinese).

Google Scholar

[7] Zhouzhou, Zhi Su, Donghuang Yan. Journal of Changsha University of Science and Technology, Vol. 3: 4(2006), pp.39-42. (In Chinese).

Google Scholar

[8] Xichun Du: Research on Assembly Technology of Long Span PC Bridges of Rigid Frame Bridge. Master Thesis, Wuhan University of Technology, Wuhan, 2006. (In Chinese).

Google Scholar

[9] Daiquan Liu, Zhengcong Long, Jie-jun Wang. Highway, Vol. 1: 1(2003), pp.121-124. (In Chinese).

Google Scholar