[1]
Yingtao Chen,Long-Span. Rigid Framed-Continuous Beam Combination System Research and Analysis, Southwest Jiaotong University. In Chinese.
Google Scholar
[2]
Gaicedo J.M. ,Marulanda J. ,Thomson P. ,Dyke S. J, Monitoring of changes in structural health, Proceedings of the American Control Conference.
Google Scholar
[3]
Maeda K Otsuka A Takano H., The design and construction of the Yokoha-ma Bay Bridge, Tokyo: Elsevier Science Publishers.
Google Scholar
[4]
H.S. Chiu, Long-Term Deflection Control in Cantilever Prestressed Concrete Bridges, Control Method[J]. Journal of Engineering Mechanics, ASCE, 1996, 122(6), pp.489-494.
DOI: 10.1061/(asce)0733-9399(1996)122:6(489)
Google Scholar
[5]
Mari Antonior, Valdes Manuel. 2000. Long-term behavior of continuous precast concrete girder bridge model, Journal of Bridge Engineering, 2000, 5(1), pp.22-30.
DOI: 10.1061/(asce)1084-0702(2000)5:1(22)
Google Scholar
[6]
Weiguo Qiao, Study of Closure Construction Control Technique for Extra Large-Span Steel-concrete and Rigid-continuous Composite Beam Bridge, Chongqing Jiaotong University. In Chinese.
Google Scholar
[7]
Xinlai Zhang, Study on Construction Monitoring of Rigid Frame-continuous Composite Box-girder Bridge, ,Beijing University of Technology. In Chinese.
Google Scholar
[8]
Zhengqiang Zhong,Influence of Girder Joint Scheme of Continuous Girder Bridge on Construction Control, ,Journal of Changsha Jiaotong University, 2002, 18(3), pp.27-31. In Chinese.
Google Scholar
[9]
Lie Chen, Selection of Structural Types and Closure Sequences for Long-Span and High-Rise Pier PC Bridge, Bridge Construction, 2005, 1, pp.33-35. In Chinese.
Google Scholar
[10]
Mu-yu Liu, Analysis of Closure Process for PC Bridges with Rigid Frame-Continuous Girders, Journal of Wuhan University of Technology, 2007, 29(6), pp.107-110. In Chinese.
Google Scholar
[11]
Qinghe Hu, Study on Structural Analysis and Closure Technic of the Multi-span Rigid-Frame Bridge, Chongqing Jiaotong University. In Chinese.
Google Scholar
[12]
Hongjiang Li, Analysis on Safety of Removing the Closure Segment in a Prestressed Concrete Cable-stayed Bridge, Procedia Engineering, 2012, Volume 31, pp.464-473. In Chinese.
DOI: 10.1016/j.proeng.2012.01.1053
Google Scholar
[13]
Yi Liu, Prestressed Concrete Continuous Rigid Frame Bridge Several Key Technology Research, Chongqing Jiaotong University. In Chinese.
Google Scholar
[14]
Shuxue Sun Hanging Basket Construction Technology in Application of Long Span Continuous Rigid Frame Bridges, Chongqing Jiaotong University. In Chinese.
Google Scholar
[15]
Yaguang Tu, Calculation Method and Countermeasure for Closure Temperature Influence in Trussed CFST Arch Bridge, Engineering Mechanics, 2008 25(4), pp.236-240. In Chinese.
Google Scholar
[16]
Jinzhou Chen, PC Continuous Box Girder Temperature Field and Effect Research, Changan University. In Chinese.
Google Scholar