Influence of Closure Sequences on the Rigid Frame-Continuous Girder Bridge Closure

Article Preview

Abstract:

Closure sequences of rigid frame-continuous girder bridge are analyzed by calculation to compare girder deflection change, pier horizontal displacement maximum, girder and pier stress value. The results show that the first side span-second side span-mid span closure sequence causes the largest girder vertical displacement and others cause almost the same vertical displacement; side piers pier top horizontal displacement is larger than middle piers whatever the closure sequence is, closure sequences could not change the stress of the girder and pier. The first side span-mid span-second side span closure sequence should be preferred.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1422-1428

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yingtao Chen,Long-Span. Rigid Framed-Continuous Beam Combination System Research and Analysis, Southwest Jiaotong University. In Chinese.

Google Scholar

[2] Gaicedo J.M. ,Marulanda J. ,Thomson P. ,Dyke S. J, Monitoring of changes in structural health, Proceedings of the American Control Conference.

Google Scholar

[3] Maeda K Otsuka A Takano H., The design and construction of the Yokoha-ma Bay Bridge, Tokyo: Elsevier Science Publishers.

Google Scholar

[4] H.S. Chiu, Long-Term Deflection Control in Cantilever Prestressed Concrete Bridges, Control Method[J]. Journal of Engineering Mechanics, ASCE, 1996, 122(6), pp.489-494.

DOI: 10.1061/(asce)0733-9399(1996)122:6(489)

Google Scholar

[5] Mari Antonior, Valdes Manuel. 2000. Long-term behavior of continuous precast concrete girder bridge model, Journal of Bridge Engineering, 2000, 5(1), pp.22-30.

DOI: 10.1061/(asce)1084-0702(2000)5:1(22)

Google Scholar

[6] Weiguo Qiao, Study of Closure Construction Control Technique for Extra Large-Span Steel-concrete and Rigid-continuous Composite Beam Bridge, Chongqing Jiaotong University. In Chinese.

Google Scholar

[7] Xinlai Zhang, Study on Construction Monitoring of Rigid Frame-continuous Composite Box-girder Bridge, ,Beijing University of Technology. In Chinese.

Google Scholar

[8] Zhengqiang Zhong,Influence of Girder Joint Scheme of Continuous Girder Bridge on Construction Control, ,Journal of Changsha Jiaotong University, 2002, 18(3), pp.27-31. In Chinese.

Google Scholar

[9] Lie Chen, Selection of Structural Types and Closure Sequences for Long-Span and High-Rise Pier PC Bridge, Bridge Construction, 2005, 1, pp.33-35. In Chinese.

Google Scholar

[10] Mu-yu Liu, Analysis of Closure Process for PC Bridges with Rigid Frame-Continuous Girders, Journal of Wuhan University of Technology, 2007, 29(6), pp.107-110. In Chinese.

Google Scholar

[11] Qinghe Hu, Study on Structural Analysis and Closure Technic of the Multi-span Rigid-Frame Bridge, Chongqing Jiaotong University. In Chinese.

Google Scholar

[12] Hongjiang Li, Analysis on Safety of Removing the Closure Segment in a Prestressed Concrete Cable-stayed Bridge, Procedia Engineering, 2012, Volume 31, pp.464-473. In Chinese.

DOI: 10.1016/j.proeng.2012.01.1053

Google Scholar

[13] Yi Liu, Prestressed Concrete Continuous Rigid Frame Bridge Several Key Technology Research, Chongqing Jiaotong University. In Chinese.

Google Scholar

[14] Shuxue Sun Hanging Basket Construction Technology in Application of Long Span Continuous Rigid Frame Bridges, Chongqing Jiaotong University. In Chinese.

Google Scholar

[15] Yaguang Tu, Calculation Method and Countermeasure for Closure Temperature Influence in Trussed CFST Arch Bridge, Engineering Mechanics, 2008 25(4), pp.236-240. In Chinese.

Google Scholar

[16] Jinzhou Chen, PC Continuous Box Girder Temperature Field and Effect Research, Changan University. In Chinese.

Google Scholar