The Research on Unloading Time of Stack Preloading Based on the Measured Data

Article Preview

Abstract:

Combined with practical engineering, the second-class level measured data is got via stack preloading experiment on the soft and weak railway subgrade. By using the hyperbolic method and three points method to fit subsidence curve, the post-construction settlement S (t =∞) and the settlement at any time S(t) is evaluated, then a reasonable unloading time is inferred by the comparison between S (t =∞) and S(t=180). Studies have shown that hyperbolic method and three points method can predict the post-construction settlement accurately, the time unloading six months after the stack is completed is quite reasonable.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1659-1663

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zuomian Pan: The Curve Fitting Method for Forecasting the Subsidence of the Soft Soil Foundation. Shanxi Architecture.

Google Scholar

[2] Linyou Pan and Xinyu Xie: Observational Settlement Prediction by Curve Fitting Methods [J]. Rock and Soil Mechanics, 2004. 25.

Google Scholar

[3] Jifu Liu, Haihong Mo and Jinxia Wei: Study on Determination of Unloading Time Using Method of Settlement after Construction. Chinese Journal of Rock Mechanics and Engineering, 2006. 10.

Google Scholar

[4] Yaqiong Qin: Study and Engineering Application on the Roadbed Settlement Prediction Method Based on the Measured Data [D]. 2008. 5.

Google Scholar

[5] Li Jin: Analysis of Several Kinds of Prediction Model in the High Embankment Settlement Prediction. [J]. West-China Exploration Engineering, 2006. 18.

Google Scholar

[6] Observation For Settlement and Deformation and Implementation Rules for Assessment on Underline Engineering of New Railway Passenger Dedicated Line from Chengdu to Chongqing, Chengdu-Chongqing Passenger Line Limited Liability Company, 2011. 2.

Google Scholar

[7] Jixin Yang, Weiwei Zhu and Lan Ding: Observation and Prediction of Settle of Bridge Pier and Abutment of Harbin Dalian Passenger Dedicated Line. Journal of Railway Engineering Society. 2010, 27(7).

Google Scholar

[8] Liqin Wang, Baocheng Jin, Youhai Yang and Wenjun Jia, etc: Contrast Study on Prediction Models of Settlement of Loess-fill Subgrade after Construction [J]. Journal of the China Railway Society, (2008).

Google Scholar

[9] Zhiliang Wang: Settlement Calculation and Prediction of Embankment on Soft Ground. [D]. Hehai University. 2004. 6.

Google Scholar

[10] Guanghua Yang: New Computation Method for Soil Foundation Settlements. Chinese Journal of Rock Mechanics and Engineering. 2008, 27(4). 2008. 4.

Google Scholar