Analysis of Crack Initiation and Treatment in the South-to-North Water Diversion Suining Two Station Project
Abstract:
For projects, especially large-scale projects, due to the long time of project construction, the construction of the complexity of the geological conditions, sometimes inevitably lead to quality defects.How scientific and reasonable quality defects hidden works to take remedial measures, or effective correction to restore the loss of time, cost, quality, safety,become an important engineering problem.Some cracks, will not have a substantial impact on the project, you can take measures to deal with to ensure proper implementation of the project.The article takes the analysis of crack initiation and Treatment in the Suining two station project.There are a lot of reference in processing defects in the country's large projects.Statistical indicators from the implementation of the results, analysis shows that to achieve even better than the regulatory requirements, and achieved the expected results.
Info:
Periodical:
Pages:
1123-1127
Citation:
Online since:
August 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: